您要查找的是不是:
- It is a fine approach to actualize the Demand SideManagement (DSM) to lessen the pressure of peak load period under the situation thatthere are limitable financing for electricity build. 在电厂建设投资资金有限的情况下实施电力需求侧管理(DSM)相关措施是解决电网高峰负荷压力大的一种途径。
- Demand-side management (DSM) is an effectual means in peak load leveling. 摘要需求侧管理(DSM)是电网移峰填谷的有效手段之一。
- The peak load current limit is set by the user's selection of a reference voltage and current-sensing resistors. 用户可通过选择参考电压和电流感测电阻设置峰值载荷电流限制。
- On that peak load day, start the Perfmon log on each server at 4:00 A.M and let it run for 24 hours. 在出现高峰负载的那天,于上午4:00在每个服务器上启动Perfmon日志,并让它连续运行24小时。
- This simultaneous generation and transmission with use requires power system capacity to meet the load demand at whatever moment it occurs. 这种随时按用电需求来发电和输电就要求电力系统的容量在无论什么时刻都能满足负荷的需求。
- Specific performance objects, counters, and instances were collected during peak load and other observation times. 在峰值负载和其他观察期收集了特定的性能对象、计数器和实例。
- Monitor the ex2003base servers for a 24 hour period on the day that usually experiences peak load (Monday for many companies). 在通常会遇到高峰负载的那天(很多公司是星期一)连续24小时监视ex2003base服务器。
- Base Load Base load is that portion of a building load demand which is constant. It is the "base" of the building demand curve. 基本负荷基本负荷是指建筑负荷需求量中不变的那一部分,是构成负荷需求曲线的基数。
- These pockets were characterized sometimes by low usage, but occasionally by a lack of sufficient resources to handle the peak load. 这些资源的特性是有时使用率很低,但偶尔会因为资源不足而被用来处理一些峰值负载。
- Base Load Base load is that portion of a building load demand which is constant. It is the "base" of the building demand cure. 基本负荷基本负荷是指建筑负荷需求量中不变的那一部分,是构成负荷需求曲线的基数。
- After analyzing the collected data, it was found that the peak load was 2,129 concurrent users averaging 18.8 Requests per second. 分析完收集的数据后发现;峰值负载为2;129个并发用户每秒平均发出18.;8个请求。
- Base Load|---|Base load is that portion of a building load demand which is constant. It is the "base" of the building demand curve. 基本负荷|---|基本负荷是指建筑负荷需求量中不变的那一部分, 是构成负荷需求曲线的基数。
- Using GM(1,1) model to predict short-period load has good accuracy, but to the high waving peak load, its accuracy is low. 用GM(1,1)模型预测短期负荷虽具有很好的精确性,但对于波动性较大的高峰负荷,它的预测精度比较低,而马尔可夫模型可以克服负荷波动较大的局限性。
- The load relaxation tests after peak load indicate that rockburst has two types the one is original rockburst, and the other is impellent rockburst. 对岩石峰值载荷后的松弛试验发现具有两类岩爆:一类是本源型岩爆;
- Since what AGC controls is the entire power network,only good tracing performances to load demand of AGC of all units in the network can guarantee good generation control quality. 由于AGC以整个电网为调节对象,因此只有电网内机组对AGC下达的负荷指令具有良好的跟踪性能时才能保证发电质量。
- Discusses the interregional control of power distribution during peak loading. 摘要探讨了在用电峰值时段对多地区之间进行限电分配的问题。
- Zhao Changcheng, Deng Youman, Ren Xiaojuan. Reactive power optimization with time-varying fuzzy load demand for distribution systems. Proceedings of Power System Technology, 2002. 梁涵茵、王念中,台电系统电压自动调整控制之可行性研究,台电94年度研究计画论文,台北,2005。
- Weekly operational checks should be carried out at 320MW in presence of shift charge Engineer. Test should be completed before system peak load period. 每星期在值长在场的情况下,机组负荷达到320MW时,进行操作检查。测试应在系统带尖峰负荷前完成。
- A multi-period linear supply function equilibrium model of electricity markets is proposed,with cross-time load demand response and transmission constraints included. 在计及输电约束的基础上,建立了一个考虑跨时段负荷响应的电力市场多时段线性供应函数均衡模型。
- The experiments show that there exists an apparent turning point before the peak load in resistance-CMOD curve of CFRC beam. 试验研究发现,峰值荷载前CFRC梁的电阻-CMOD曲线均出现明显的转折点。