您要查找的是不是:
- The general loading arithmetic of Gauss heat source in ANSYS welding simulation is loading heat flux(HF)on the whole welding surface based on TABLE array parameters. ANSYS焊接仿真中高斯热源的一般加载算法是:基于表参数的整面热流密度加载。
- Demand-side management (DSM) is an effectual means in peak load leveling. 摘要需求侧管理(DSM)是电网移峰填谷的有效手段之一。
- The peak load current limit is set by the user's selection of a reference voltage and current-sensing resistors. 用户可通过选择参考电压和电流感测电阻设置峰值载荷电流限制。
- Do not closed with heat sources equipment or other heat radiating object. 靠近热辐射装定或其它热辐射物体的顶部。
- On that peak load day, start the Perfmon log on each server at 4:00 A.M and let it run for 24 hours. 在出现高峰负载的那天,于上午4:00在每个服务器上启动Perfmon日志,并让它连续运行24小时。
- Specific performance objects, counters, and instances were collected during peak load and other observation times. 在峰值负载和其他观察期收集了特定的性能对象、计数器和实例。
- Presents the general situation of the building, and the design parameter selection, system arrangements air distribution, load characteristics, cold and heat sources, water system design of the air conditioning system. 摘要介绍了该楼的建筑概况及空调系统设计参数的选择、系统设置、气流组织、负荷特点、冷热源配置、水系统设计等。
- Monitor the ex2003base servers for a 24 hour period on the day that usually experiences peak load (Monday for many companies). 在通常会遇到高峰负载的那天(很多公司是星期一)连续24小时监视ex2003base服务器。
- Do not place LCD on heat source positions. 不要把显示器放在热源位置上。
- These pockets were characterized sometimes by low usage, but occasionally by a lack of sufficient resources to handle the peak load. 这些资源的特性是有时使用率很低,但偶尔会因为资源不足而被用来处理一些峰值负载。
- After analyzing the collected data, it was found that the peak load was 2,129 concurrent users averaging 18.8 Requests per second. 分析完收集的数据后发现;峰值负载为2;129个并发用户每秒平均发出18.;8个请求。
- Using GM(1,1) model to predict short-period load has good accuracy, but to the high waving peak load, its accuracy is low. 用GM(1,1)模型预测短期负荷虽具有很好的精确性,但对于波动性较大的高峰负荷,它的预测精度比较低,而马尔可夫模型可以克服负荷波动较大的局限性。
- The accessibility analysis of joint operation of heat-supply systems with double heat sources is made. 对双热源供热系统联网运行进行了可及性分析,制定了最佳运行方案。
- The load relaxation tests after peak load indicate that rockburst has two types the one is original rockburst, and the other is impellent rockburst. 对岩石峰值载荷后的松弛试验发现具有两类岩爆:一类是本源型岩爆;
- Weekly operational checks should be carried out at 320MW in presence of shift charge Engineer. Test should be completed before system peak load period. 每星期在值长在场的情况下,机组负荷达到320MW时,进行操作检查。测试应在系统带尖峰负荷前完成。
- Do not bleach and leave to dry away from heat source. 不要漂白也不要用加热来烘干它。
- Do not leave the unit in a location near heat sources, or in a place subject to direct sunlight, excessive dust or mechanical shock. 不要把本机放在靠近热源或受阳光直射、多尘或机械震动的地方。
- The experiments show that there exists an apparent turning point before the peak load in resistance-CMOD curve of CFRC beam. 试验研究发现,峰值荷载前CFRC梁的电阻-CMOD曲线均出现明显的转折点。
- Dry, cool conditions, faraway from fire and heat source. 干燥;凉爽环境下;远离火源;热源.
- The simulation results show that the model is practicable and feasible, and it is beneficial to reduce the gild peak load and improve the load curves. 算例仿真分析表明该模型是切实可行的,它有利于减小电网高峰负荷,改善负荷曲线。