您要查找的是不是:
- Physical model tests were carried out to investigate the effects of offshore submerged dike on overtopping of regular waves over the main seawall. 本文针对不同的潜堤与海堤距离以及不同的潜堤高程,进行了规则波作用下越浪量系列物理模型实验,给出了各工况下的实测越浪量。
- Stability and overtopping of different types of arc crown walls are discussed.The characteristics of wave loads are analyzed. 因此在满足防浪要求条件下防浪墙的设计应当力求经济合理。
- In Tsengwen Dam Raise Reservoir Water Level Project at Taiwan, the greatest construction risk is the overtopping of the dam by flood when the crest is lowered by excavations. 但在取得成绩的同时,也陆续出现了若干座水库在除险加固完成后或加固过程中发生溃坝的不正常现象,反映病险水库除险加固工作还存在不可忽视的缺陷。
- Based on the hydraulic model test, the trealment of shock wave in the design of spillway chute bend is proposed,and its effect is good. 在水工模型试验基础上,提出了在河岸式溢洪道弯道陡槽、底流消能设计中,处理泄流冲击波的方法,且效果良好。
- The problems such as design of rockfill dam with high core wall, the stability of surrounding rocks and the design of spillway are the key to the project construction. 该工程高心墙堆石坝设计、地下厂房围岩稳定、溢洪道设计等问题是工程建设的关键问题。
- The geological condition in the inlet of spillway tunnel of Hengquan Reservoir is very complex,rock wheathering is severe and the stability of adjoining rock of tunnel is bad. 横泉水库泄洪洞进口地质条件复杂,岩石风化严重,围岩稳定性较差。
- According to the design of spillway dam on arch dam in Wanjiagou reservoir,this paper elaborates special problems and solving method of spillway dam in design and construction. 本文以万家沟水库拱坝溢流坝的设计为例,阐述了这种坝型设计及施工的一些特殊问题及解决方法。
- This paper sets forth the building technology of spillway curtain grouting at Daxijiang Reservoir and solving method of special condition in the grouting. 阐述了大西江水库溢洪道帷幕灌浆的施工工艺及灌浆中出现特殊情况的处理方法;灌浆质量与效果分析表明,质量优良,完全符合质量评定标准。
- How can I persuade you of my sincerity? 我如何能够让你相信我的诚意?
- There is a vein of melancholy in his character. 他的性格中有少许忧郁的气质。
- A bowl of hot chicken soup is good for you. 喝一碗热鸡汤对你有好处。
- A cloud is a mass of vapor in the sky. 云是天空中的水汽团。
- This strain of wheat can grow during a cold spring. 这种小麦可以在寒冷的春天生长。
- Have a glass of beer to rinse your dinner down. 喝杯啤酒把你吃的晚饭冲下去。
- I bought a pair of tan leather shoes the other day. 前几天我买了双棕褐色的皮鞋。
- Some remedies to quality defects during the concrete placement at irregular circular arc segment of spillway and overflow weir are proposed and may be referred to by similar projects. 在浇筑溢洪道溢流堰不规则圆弧段混凝土施工,提出质量缺陷的补救对策,以供同行参考。
- Your work falls short of my expectations. 你的工作未达到我的期望。
- He bit off a large piece of the apple. 他咬下一大块苹果。
- The guide wall of spillway in hydro project is subject to long-term complicated loads,such as alternative water pressure and wind pressure,which may lead to the damage of structures. 水电站厂坝间溢洪道泄槽的导墙结构长期处于水流交变荷载作用,容易造成结构损伤。
- He emphasized the importance of careful driving. 他强调小心驾驶的重要性。