您要查找的是不是:
- The change of the flue temperature in a coking period is a hyperbola.Two undulances of the hyperbola change with the operating sequence, overhaul schedule and the direction changed period. 摘要火道温度随结焦周期的变化呈双峰曲线变化规律,双峰曲线的两个波形随著推焦计划、检修时间与周转时间的不同而变化。
- I was frantic to finish the report on schedule. 我十万火急地要按预定时间完成报告。
- I've taken my typewriter in for an overhaul. 我已把打字机拿去彻底检修了。
- I haven't got a clue about the train schedule. 我一点都不知道这个列车时刻表。
- The delays put the whole schedule out of joint. 一再的拖延打乱了全部安排。
- The engine is due for an overhaul. 那台发动机该大修了。
- The project was completed ahead of the schedule. 这项工程提前完工。
- The new schedule come into operation on June 1st. 新的日程表是从6月1日开始实行的。
- The plane's departure was on schedule. 飞机准时起飞。
- They have planned a tight schedule of travel. 他们安排了一个紧凑的旅行日程。
- The principal has a very tight schedule. 校长的日程表排得满满的。
- The project is behind schedule again. 这项计划又没按时完成。
- The teacher posted the schedule of classes. 教师将课程表公布出来了。
- The new schedule is O.K. with me. 新日程表对我是合适的。
- Have you got a schedule of postal charges? 你有没有邮资价目表?
- Your car really needs a thorough overhaul. 你的车确实需要大修了。
- He was bidden to finish the work on schedule. 我要他按时完成工作。
- George always falls behind his schedule. 乔治老是不能按时完成计划。
- It did need to overhaul techniques. 那的确需要革新技术。
- Met the schedule and was home free. 完成计划后感到极为轻松