您要查找的是不是:
- overfall spillway 坝顶溢洪道
- The spillway of Fengyangshan Reservoir is a flank trough one, according to the local condition, its sluice has used a chequer overfall weir, and the top of the weir is WES-V one. 凤阳山水库溢洪道为侧槽式溢洪道,其泄洪闸采用格仓式溢流堰,堰顶采用WES-V型实用堰。
- The spillway face are RCC benched spillway face. 溢流坝面为碾压混凝土台阶式溢流面。
- Dongfeng hydropower station is open ski spillway. 东风水电站溢洪道为明流滑雪式溢洪道。
- Note: (Y) Show in the type that have grid type and overfall type. 注:型号中带(Y)表示该型号溢流、格子两种形式均有。
- The importance of a safe spillway cannot be overemphasized. 安全溢洪道的重要性无论怎样强调也不会过分。
- The spillway is opened and the flood runs down rapidly. 泄洪闸打开了,洪水奔流而下。
- The typical seepage flow field of the bottom for the spillway dam is obtai... 最后计算了典型的坝基渗流流场,计算结果与实验结果吻合较好。
- The spillway can't be blocked, otherwise it will cause a serious problem. 不能堵塞洩洪道,否则后果不堪设想。
- Firstly,the self-swash dust catcher with the unique overfall device was adopted to dedust,desulfate and denitrogena... 此类装置还可应用于矿山、化工和建材等领域中的湿法除尘。
- The principle, mathematical deduction and applications of a new preset pressure value overfall valve arediscussed. 论述了新型可知设定值式溢流阀的工作原理、数学推理及应用。
- The overfall can expand the joints, and the line of air vents can show necklace image. 溢流会造成焊缝区域扩大;而连成线的气孔会显示出线状珠子图像。
- The outflow through gate controlled multi-opening spillway of Yinhe Reservoir was analyzed.The analysis results were checked by the site observed data. 分析了音河水库多孔有闸门控制的溢洪道出流,并用出流的实测资料进行了检验。
- A major vertical fault scarp formed during the earthquake was less than 1000 ft from the spillway. 地震时形成的一个主要的垂直断层崖,离溢洪道不到1000英尺。
- The concrete placement for spillway and overflow weir at Dongba Hydropower Station employs light truss type formwork. 洞巴水电站溢洪道溢流堰的混凝土浇筑使用轻型桁架模板。
- The energy dissipation rate is 40 to 70% higher than that of the skimming spillway. 在试验范围内,台阶式溢洪道与光滑溢洪道比较,消能率可以提高40%25 ~70%25。
- This paper introduces the structure, work laws and process of overfall valve and rotate speed control valve in a lately devel oped cleaner. 介绍新研制的一种新型清洗机所采用的调压溢流阀和转速调节阀结构、原理及工作过程。
- Abstract: The flaring gate piers (FGP) are combines with the stepped spillway and stilling pool. 文章摘要: 将宽尾墩、阶梯溢流坝和消力池联合起来形成一体化的水工消能设施。
- But when the traffic is inconvenient, the cofferdam only constructed by manpower and needs overfall, traditional styles of cofferdam are unuseful. 而对于交通不便,只能以人力施工为主的地区,且需要短期溢流的临时挡水设施,传统的围堰形式则无能为力。
- The stepped spillway is interested by engineers due to its excellent function of energy dissipation and aerification. 台阶式溢洪道因其显著的消能、掺气效果而倍受工程界的关注。