您要查找的是不是:
- Second, based on resource-constrained project scheduling problems (RCPSP) extended to multiple projects and multiple depots considerations, a symbiotic evolutionary algorithm is presented and solved. 其二,以有限资源排程问题角度,采取共生式进化演算法架构为求解演算法机制,有效考虑多重专案与多单位工程资源之路网抢修排程问题。
- Quantitative Analysis of Critical Chain Multiple Project Scheduling Management 关键链项目群进度管理的定量分析
- multiple projects scheduling 多项目调度
- How can I work with multiple projects in Project? 如何在Project中使用多个项目?
- Ability to manage multiple projects. 独自管理项目的能力.
- A Personalization run-time server may support multiple projects. 个性化运行时服务器可以支持多个项目。
- You could easily extend the harness to support multiple projects. 可以容易地扩展这个装具模块让它支持多个项目。
- Comparison with other tested heuristics verifies that the proposed random sampling method is significantly superior to other heuristics for scheduling resource-constrained multiple projects. 与其他多项目调度启发式算法的比较和统计检验,说明随机抽样算法显著优于这些常用的启发式算法。
- How Realistic is Your Project Schedule? 你的项目进度现实吗?
- How does Microsoft Project schedule a project? Microsoft Project如何排定项目的日程?
- The big picture: How is a project scheduled? 概述:如何安排项目日程?
- Also, cross-project reports can compare historical data for multiple projects. 而且,交叉项目报告可对多个项目的历史记录数据进行比较。
- Callahan, M.T., Quackenbush, D.G. and Rowings, J.E., Construction Project Scheduling, McGraw-Hill, USA, 1992. 林耀煌,营建工程施工规划与管理控制,长松出版社,台北,1995。
- A proficient problem solver, able to balance multiple projects and tasks. 能够合理安排工作项目和任务,有效解决问题。
- Applying Gantt Charts on project scheduling, implementation plan is put forward. 用甘特图进行项目的进度安排,提出了实施计划方案;
- A description of construction project scheduling problem with flow processes is given. 首先给出了带流水作业工程项目调度问题的描述;
- Party B shall report to Party A about the project scheduling, cost control,and sale performance and related monthly. 乙方应每月向甲方汇报上述项目的进度、成本控制及销售情况的有关情况。
- Because cost can be an important aspect of project scheduling and control, Project provides for several different types of costs. 由于成本是项目日程排定和控制的一个重要方面,Project提供了几种不同类型的成本。
- Callahan, M. T, Quackenbush, D. G., Rowings, J. E, “Construction Project Scheduling,” McGrawHill, New York, N. Y., 1992. 刘福勋,实用工程进度规划与控制,詹氏书局,台北,1998年二版。
- Finish No Later Than (for projects scheduled from the finish date). 不得晚于。完成(适用于从完成日期起排定日程的项目)。
