您要查找的是不是:
- I bought a toy soldier with movable arms and legs for my son. 我给我儿子买了一个胳膊腿可移动的玩具兵。
- Pls. fix ocket with movable titche a ealing ample. 请跟原办在口袋上车上(可拆去的)假缝线。
- Mining with backfilling is restrained by relatively high filling cost. 充填采矿由于充填成本较高而制约着其发展。
- Ground Pressure Monitoring of Top Caving Coal Mining with Movable Support in Relatively Thin Thick-seam 较薄厚煤层悬移支架放顶煤的矿压监测
- The art and technique of printing with movable type. 铅印术用活铅字印刷的艺术和技术
- Pls. fix pocket with movable stitches as sealing sample. 请跟原办在口袋上车上(拆去的)缝线。
- Please fix pocket with movable stitches as sealing sample. 请跟原办在口袋上车上(可拆去的)假缝线。
- This play of mine with you is a play from afar. 我们之间是远距离的游戏。
- I happen to have mine with me. Where's yours? 我刚好带在身上,你的呢?
- A manual computing device consisting of a frame holding parallel rods strung with movable counters. 算盘一种手动计算器,由装有平行木杆的框架构成,木杆上串着可移算珠
- The U shape building is enclosing internal shopping gallery with movable pneumatic roof. 字形的建筑,将内部购物走廊围合,同时有一个活动电气屋顶。
- The stability of ore and rock in Lianjiang Silver Mine is very poor so that an overhand slice and drift mining with cemented tailings filling was used for mining. 廉江银矿的矿岩稳固性很差,采用上向进路尾砂胶结充填采矿法。
- I think your plans will chime in with mine. 我想你的计划会同我的相吻合。
- The paper pointed out the development tendency of the pseudo inclined coal mining with flexible shield supports. 提出了伪斜柔性掩护支架开采技术以后的发展趋势。
- That done, the aircraft flies over again, this time detonating each mine with a hit from a directed energy beam. 上述工作完成后,飞机再次飞过来,这一次是用定向能源束的冲击力引爆每颗地雷。
- This article introduces the background, basic tasks and methods of Data Mining with pellucid examples. 本文介绍了数据采掘技术的产生背景、基本任务和方法,并举例加以说明。
- The architectural design utilizes the southern orientation with a southern glass facade with movable sun blinds. 建筑设计采用南部方向,以南部的玻璃幕墙与动产孙百叶窗。
- Feasible drawing interval is the basis to study mining equipment of fully-mechanize coal mining with caving method. 综放开采的合理放煤步距是研制综放工作面成套技术装备的基础,是提高综放工作面采出率与煤质的关键之一。
- toy soldiers with movable arms and legs 手脚活动的玩具兵
- In the research on Jingtang Harbour the co-action of wave and current with movable trubid water model was firstly considerd. 京唐港入海航道回淤问题试验研究,苏州工业园区华能发电厂冷却水试验研究,曹妃甸潮汐水流和泥沙问题数模和物模研究。