您要查找的是不是:
- management of labor cost 人工成本管理
- The challenges of attendance tracking management include the need for flexible shift or roster plans, control of labor costs and real-time attendance monitoring and analysis. 企业要建立高效的考勤管理所面临的挑战包括:灵活合理的排班计划,劳动力成本的有效控制,实时的考勤数据审核和分析。
- It takes a lot of labor to build a railway. 修筑一条铁路要花费许多劳动力。
- Around 1980, because of the increase of labor cost in Japan, many Japanese manufacturing companies began to transfer their production basis to the South East and afterwards to China. 摘要大约在1980年,因为日本劳动成本的增加,许多日本的制造公司,开始转移基本的生产至东南亚以及之后的中国。
- Article 9 The Ministry of Labor and Social Security shall be responsible for formulating the relevant polices on the management of enterprise annuities fund. 第九条劳动保障部负责制定企业年金基金管理的有关政策。
- The direct labor costs are derived by multiplying the cost of labor per hour by the number, of man-hours needed to complete the job . 直接人工成本是用每小时的工人成本乘以完成一项任务所需人工小时数得来的。
- There is a clear division of labor in ants. 蚂蚁间有明确的分工。
- Establishment and management of firm labor cost index system 企业人工成本指标体系的建立与管理
- These robots will save us a lot of labor. 这些机器人可以节省我们大量劳工。
- The convoy commodore sees to the internal management of the convoy. 舰队司令官负责管理舰队的内部问题。
- The cost of labor is very low in China. 中国人工成本很低。
- The ministry of Labor and social security of JiangsuProvincepromulgated the notice, and demanded to reinforce the management of the system of synthesis man-hour and working at irregular time. 江苏省劳动和社会保障厅发文要求加强对企业实行综合工时制和不定时工作制度管理的通知。
- The price does not include the cost of labor. 那个价钱不包含劳力成本。
- Finally, for the two great issues the reason of electrocution in building areas and the safety and health management of labor, A discuss the prevention way of electrocution separately. 最后针对建筑工地劳安管理及工程实务两大层面,探讨感电事故防止对策。
- So labor costs per ton of guano will rise in real terms unless technological advances allow more efficient use of labor. 所以每吨海鸟粪的人工成本以真实方式计会上升,除非技术进步允许更有效率的运用人工。
- Management of the quality cost II. 品质成本管理2。
- The secondary advantages can include a significant reduction of labor costs, as no post visual inspection is needed as in traditional dicing processes. 第二大优点包括,降低了人工费用,不需要常规的后续视觉检测。
- Cost management of engineering II. 工程造价管理2。
- Wage Adjustment Based on the Cause of Labor Cost 基于发生性质的薪酬调整方法
- II. Controlling the labor cost of the Security Department. 控制保安部门的人力成本。