您要查找的是不是:
- management at factory level 厂级管理
- Or its agent inspection at factory to be final. 以买方或其代理人在工厂的检验为准。
- I would like to emphasize that we are ready to meet the management at any time. 我想着重指出,我们愿意在任何时候与管理部门会谈。
- I'm going to study management at the same time. 同时,我要学习管理。
- The execution of 5S management at workshops. 负责工作区域的5S管理。
- I showed my pass to the man at factory gate, and was allowed in. 我向工厂门口那人出示了通行证,就让进去了。
- Are full containers loaded at factory for limited brands? 是否所有在工厂装货的集装箱有限制商标?
- Buyers' or its agent i ection at factory to be final. 以买方或其代理人在工厂的检验为准。
- "The proof when investment is pair of group be convinced, invested 2 rounds, how to oppugn their mode or level of management at that time? “投资时证明是对团队信服的,投资了2轮,当时怎么不质疑他们的模式或管理水平?
- Mr. Drucker was professor of management at New York University. 德鲁克先生是纽约大学的管理学教授。
- I paid in a cheque for a hundred pounds to keep the bank manager at bay. 我用支票支付了100英镑,以避开银行经理来找麻烦。
- Mr. Drucker was a professor of management at New York University. 德鲁克先生是纽约大学的管理学教授。
- The management at state-owned GDF has accused unions of stalling. 在州立的GDF的管理已经控告管套节停顿。
- Managers at one unapproved foodstuffs factory near Hebei were arrested. 河北附近一家未经审批的食品厂的管理人员被逮捕了。
- I was manager at the time for Sir Ross Smith. 那时我是澳洲飞行家史密斯的经理人;
- Procurement management at OU level and ensure following Group Procurement accountabilities and processes. Support CCCIL GPF GM and BIG China CFO in areas of Group Procurement. 营运单位的采购管理及确保营运单位的职责与流程与集团采购一致。支持集团绩效财务总经理及BIG中国首席财务官关于集团采购的工作。
- Responsible for the debugging and testing of the control system of asphalt plant at factory. 在设备出厂前,对设备控制系统进行调试。
- The G2 adjustment is a service or factory level adjustment, normally only done at the factory or at installation, which adjusts the bias current for each tube individually so that they all come on at the same time. 每一只投影管都需要一定量的偏置电流才能够正常工作,然而,每只管及其相应的电路参数都会有些差异,因此所需的偏置电流也不太一样。
- Purchase manageable at indication however shipment June July seller option. 一切按指示洽购,但装船要在六、七月间,由卖方自行选定。
- We choose to load the shpt into container directly at factory which will decrease the demage in transit maximally. 我们都是在工厂直接将货物装入集装箱,这样可以最大限度的降低在运输途中的损坏。