您要查找的是不是:
- main pier base ditch 主墩基坑
- In this paper, the earthquake liquefaction for main pier base of Jingsha Changjiang bridge is comprehensively analyzed by two methods, ie empirical discriminant method and trial and error analysis. 摘要本文利用经验判别法和试验-分析法对荆沙长江公路大桥主桥墩基场地的地震液化进行了综合判别。
- Based on the construction practice of steel cofferdam for pier base of main pier No.6 close to the pylon of Sutong Bridge, the key techniques for design and construction of the deep water double-wall steel cofferdams of the Bridge are described. 摘要以苏通大桥近塔墩主6号承台钢围堰工程实践为基础,介绍该桥深水双壁钢围堰设计、施工的关键技术。
- Winter Construction of Large Volume Concrete for Main Pier Base of Shenyang Gonghe Cable Stayed Bridge 沈阳市公和斜拉桥主墩承台大体积混凝土的冬季施工
- Construction Temperature Control to Mass Concrete of Main Pier Base of Sanfu Ereeway Maokengxi Especially Big Bridge 三福高速公路猫坑溪特大桥主墩承台大体积混凝土施工温度控制技术
- Research of earthquake liquefaction for main pier base of the Jingsha Changjiang highway bnridge 荆沙长江公路大桥主桥墩基地震液化研究
- Crack Control of Super Mass Concrete of Main Pier Base of XinGuang Bridge in Guangzhou 跨江拱桥主墩承台超大体积混凝土防裂质量控制措施
- Green Whitehead streets exempted base ditch, Big Wave ditch, Dangou, Majiagou, Castle Peak, White Ping Road, on the Ping, Yang Jiawan, Green 9 Shiwan village committee. 青白石街道辖碱水沟、大浪沟、石沟、马家沟、青山、白道坪、上坪、杨家湾、青石湾9个村委会。
- GAO Guang-yun.Calculation and measurement of settlement for belled pier base in loess[J].Industrial Construction,1995,25(1):30-36. [2]高广运.;黄土层中扩底墩基础的沉降计算和实测[J]
- This paper introduces the construction techniques of U shaped caisson of main pier of Huanghe bridge on Yingu expressway. 本文介绍银古高速公路三标黄河特大桥(拓宽工程)主墩承台U型沉井施工技术,重点介绍沉井下沉施工及纠偏方法。
- This paper presents the construction methods of mass concrete for main pier abutment of the Fourth Bridge on Xiangjiang in Xiangtan. 本文对湘潭湘江四大桥主墩承台大体积混凝土施工中的施工方法进行阐述,并对施工过程中应该注意的质量控制方法进行分析和总结。
- This paper describes the construction methods for sinking control of the very huge steel boxed cofferdam for main pier No.6 of Dashengguan Changjiang River Bridge in Nanjing. 摘要介绍南京大胜关长江大桥6号主墩超大型钢套箱围堰下沉施工控制方法。
- With descending of the main pier s foundation slab and integral moving of pier,not only the navigable dimensions meet the demand,but also the influence on upbound ships is very li. 通过下降主墩承台及整体北移桥墩,使通航尺度达到要求,且对船舶上行影响极小。
- Causes and Treatments for Concrete Pier Base Crack 混凝土墩台裂缝成因与处理
- Analisys of Level Force of Flexible Pier Base 柔性墩台水平力浅析
- Analysis of Cracks in the Main Pier of a Bridge 鄂州特大桥墩身裂纹分析
- This paper presents the construction highlights and principal technical measures adopted in the construction of pylon pier bases of Gonghe Cable Stayed Bridge in Shenyang in winter season. 介绍沈阳公和斜拉桥主塔承台冬季施工的要点和实施中的主要技术措施。
- Two main piers were constructed as spread foundations by Laying-down caisson method at positions with great sea depth and strong tidal current. 两个主墩建在水深、潮急的设置沉箱基础之上,而两岸庞大的锚碇基础则分别使用了不同的新技术。
- The main impediment to growth is a lack of capital. 影响发展的主要障碍是缺乏资本。
- The paper introduces the design and construction of the anchorage system for the steel cofferdam of 2 # and 3 # main piers of Luzhou Yangtze River Bridge. 介绍了隆叙铁路泸州长江大桥 2 %23、3%23主墩钢围堰锚碇系统的设计与施工。
- 今日热词
-
- 深远海浮式风电平台 - deep-sea floating wind power platform
-
- 京雄高速公路 - Beijing-Xiongan expressway
-
- 农业及相关产业增加值 - the added value of agriculture and related industries