您要查找的是不是:
- In the course of construction of main dam foundation drainage holes for Baise Multipurpose Dam Project,few drainage holes had seen abnormal high drain discharge. 百色水利枢纽主坝坝基排水孔在施工过程中,少数排水孔出现排水量偏大的异常情况。
- Analysis of Engineeing Quality Damage of Main Dam Foundation Concrete in Dashankou Hydropower Station 大山口水电站大坝基础混凝土工程质量事故分析
- Application of diffuse pressure typed anchorage cable of the Changtanhe main dam foundation processing 压力分散型锚索在长滩河大坝基础处理上的应用
- main dam foundation 大坝基础
- The soft foundation dam section has two cracks in the Flying gorge key WR project main dam near Changshuitang because of uneven settlement influence. 飞来峡水利枢纽右岸长水塘附近的软基坝段因受坝基的不均匀沉降影响,产生了两条横向裂缝。
- Its dam foundation grout curtain and backfilling technologies are advanced. 在大坝基础工程帷幕灌浆、回填技术上处同行之首。
- Do U mean taking the PLB 82 to the terminal and walk 15 mins to the main dam? 恐怕除了小巴%2382(荃湾兆和街上车;近众安街口)+步行15分钟;别无它法了...........
- The main dam of the upper reservoir of Yixing Pumped Storage Power Station is a rockfill mixed dam with reinforced concrete face slab built on the inclined construction foundation surface. 摘要江苏宜兴抽水蓄能电站上水库主坝是建在倾斜建基面上的钢筋混凝土面板堆石混合坝,该坝型为国内外罕见。
- The information refers to slopes in opencast mines, quarries, dam foundation excavations and highway outs. 这份资料提供了有关露天矿、采石场,坝基和公路堑的边坡资料。
- Leakage in a dam foundation may sometimes be overcome by digging deep into it so as to build a cutoff wall into the foundation. 坝基漏水的现象,有时可以用深挖地基建造堵截水墙的办法来克服。
- The principle, method, and results for the design of the filter in the Siping earth-and rock-filled main dam are discussed in this paper. 摘要阐述寺坪土石坝反滤设计的原则、方法和成果。
- Karst collapse near the dam foundation or building threaten directly building stability and safety, even result in building accident. 如果岩溶塌陷发生在坝基或建筑物部位,则直接威胁建筑物稳定安全,有的还造成建筑物的失事。
- The lower reaches of the main dam seepage 26 liters per second, the main dam measured infiltration routes within the design infiltration routes. 主坝下游渗流量26升每秒,主坝实测浸润线低于设计浸润线。
- Deformation modulus for dam foundation rock must be de termined reasonably when stress in dam is analyzed with arch and cantilever tria l load method . 在拱梁分载法坝体应力分析时,需要合理确定坝基岩体的变形模量值。
- Project by the main dam, the auxiliary dam, spillway, water holes, with the dam and power station and other building components. 枢纽工程由主坝、副坝、溢洪道、输水洞、电站及引水坝等建筑物组成。
- For low head gated dam on sand and gravel foundation,it is safe and effective to carry out high pressure jet grouting at the dam foundation. 在砂砾石地基上修建低水头闸坝,采用高压喷射灌浆加固砂砾石地基是一项安全、有效的工程处理措施。
- The first concrete face and its strengthening face are destroyed by the inverse seepage water pressure on dam foundation. 大坝一期混凝土面板和一期面板的补强面板分别遭受坝基反渗水压力的破坏。
- Design, testing and research results of surface spillway tail-flaring pier joint energy dissipator of the RCC main dam of Baise Multipurpose Dam project is introduced. 介绍百色水利枢纽RCC主坝表孔宽尾墩联合消能工设计、试验研究成果。
- The fractal structure of rock fracture in dam foundation of the Three Gorges Project under uniaxial compression is studied based on fractal theory. 基于分形理论,研究了单轴压缩状态下三峡坝基岩石破裂的分形结构。
- The trial load method, in which the effect of deformation of dam foundation is roughly taken into acount by the formulae developed by F. 多拱多梁法(试载法)是拱坝应力分析的主要方法,其中坝基变形常采用伏格特公式粗略计算。