您要查找的是不是:
- main and auxiliary shaft hoist 主、副提升机
- Mechanical type chuck cutter of main and auxiliary body; d. 机械式主辅卡刀体;.
- Improvements of Brake-clearance Protector for Main and Auxiliary Shafts Winder 主副井绞车闸间隙保护装置的改进
- Reform of frequency conversion of electrical apparatus control system to traveling cranes of main and auxiliary shafts of mine 煤矿主副井行车电控系统变频调速改造
- The pontoon is non-self-propelled. The main and auxiliary generator sets in the engine room provide enough room provide enough power for operation and livelihood. 船体为非自航式,机舱内的主副发电机组可供装卸作业与生活用电。
- It underground powerhouse is composed of main and auxiliary powerhouses, main transformer chamber and swith-yard and busbar tunnel, etc. 地下厂房系统由主副厂房、主变及开关室、母线洞等组成。
- All of the pumps which feed the main and auxiliary hydraulic systems are con-nected to, and driven by, a single pump drive transmission (PDT). 液压泵驱动装置和空气压缩机分别安装在位于公用基底层上一个电动机相反的两端。
- The pontoon is non-self-propelled.The main and auxiliary generator sets in the engine room provide enough room provide enough power for operation and livelihood. 船体为非自航式,机舱内的主副发电机组可供装卸作业与生活用电。
- auxiliary shaft hoist 副井提升机
- In this paper a method which computes the ampere winding of main and auxiliary focus coil of the electron gun is introduced. It offers a reliable way to design the coil and control the output current of electric circuit. 介绍了在电子枪设计过程中,主、辅聚焦线圈安匝数的一种计算方法,为设计线圈绕组的匝数和控制电路的输出电流提供了可靠的依据。
- separaling main and auxiliary part 主辅分离
- The transfer of pages between real storage and auxiliary storage. 实存与辅存之间的页面传送(过程)。同pageturning。
- Research and Design of Main and Auxiliary Fuse Alarm Unit 主副熔丝报警器的研究与设计
- Discussed the construction method of skip loading chamber and coal bin under rebuilding from auxiliary shaft to main shaft by using fomer equipments. 介绍了庞庄矿副井改主井时,利用井筒原有装备施工箕斗装载硐室和煤仓的施工方法。
- Percarbonate,inorganic alkali and auxiliary. 过碳酸盐、无机碱、助剂。
- auxiliary shaft hoisting 副吉提升
- Connections for main and crosshead lubrication . 主润滑油路和十字头润滑的连接。
- This paper introduces the factros of wear and tear about inclined shaft hoist wire rope and formed invalidity tree.It offered the reliable basis of invalidity for the mining production. 介绍了引起斜井提升钢丝绳失效的各种因素,并建立“失效树”,为煤矿生产中判断其失效原因及预防提供可靠依据。
- Water-tube boilers and auxiliary installations - Part 1: general. 水管锅炉和辅助设备。第1部分:总则。
- Accept the parts and auxiliary materials as per parts list. 按照零件清单接收零件及辅助材料。