您要查找的是不是:
- load at pile top 桩顶荷载
- My load at work has been getting heavier recently. 最近我的工作量在不断加大。
- Analysis results show that location of pile neutral point is the lowest and downdrag caused by NSF is maximal if neglecting working load on pile top. 分析结果表明,不考虑桩顶荷载的中性点位置是最低的,下拽力是最大的。
- As the load weight changes, the either raises or lowers, keeping the top of load at a convenient height. 可随承载重量的变动,台面自动上升或下降,保持人体工学上方便作业高度,达到省力,避免工作伤害之创新机型。
- Too many deployed activations are attempting to load at once. 一次尝试加载的已部署激活太多。
- A gun or other firearm loaded at the breech. 后膛枪,后膛炮在后膛装弹药的枪或其它火器
- If the module cannot load at its preferred base address, it cannot load at all. 如果模块不能加载到它的首选基地址,那么它就根本无法加载。
- C=Safe concemtrated load at vertical flat-steel direction in KN/m width. 加在正交于扁钢方向(垂直方向)上的安全外加线载荷,用千牛顿、米宽表示。
- Debating the influence of module radio、pile lengthl、oad and pile top stress,getting some worthy conclusion in engineering. 探讨了桩土模量比、桩长、荷载对桩顶应力的影响,及桩土模量比对桩土中荷载传递规律的影响,得到了具有一定工程价值的结论。
- The document begins loading at this point. 文档在此时开始加载。
- Problem on the bearing capacity of cast-in-place pile influenced by the deposit at pile end and the mud hanged on pile shaft can be solved by the technique with the post grouting. 灌注桩后压浆技术解决了桩底沉淤和桩身泥皮影响灌注桩承载力的问题,使桩底、桩侧土得到了加固,从而大幅度提高了灌注桩的承载力,降低了桩的沉降量。
- We shall be glad to make you special offer for order of not less than a truck load at a time. 如一次订货超过一卡车以上,我们将给与特别优惠价。
- In-situ measurements of rock loads at pile bottom and frictional resistance of short piles 桩底原位岩石载荷和短柱摩阻
- Which contains the path of the file to be loaded at run time. 该变量包含要在运行时加载的文件的路径。
- Analysis on pile top equivalent Q-s curve in load box test 载荷箱试验中的等效桩顶Q-s曲线分析
- Are full containers loaded at factory for limited brands? 是否所有在工厂装货的集装箱有限制商标?
- The ratio of output power to input power expressed as a percentage. This is generally measured under full load at nominal line voltage. 输出功率与输入功率之比的百分数。通常是在满负荷额定线电压下测定的。
- The interaction between the resistance at pile end and the resistance of pile is researched through the indoor model test on the rock-socketed pile. 以嵌岩桩为例,通过进行室内模型试验分析,研究了桩端阻力与桩侧阻力的相互作用。
- Shipper is to pack the container in full load at his plant or at his place of business. 托运人则在其工厂或业务场所进行整箱装箱。
- Place the top lift onto the abrasion paper mounted on this tester. Abrade the specimen under the specified load at a certain abrasion times to assess its abrasion degree. 将天皮于试验机上以规定之次数及荷重来回磨擦后观其耐磨耗程度.