您要查找的是不是:
- lime soil base course 灰土基层
- Such crops won't grow in limy soil. 这类作物不能在石灰质的土壤中生长。
- Storing coal,coal gangue,coal cinder,coal ash,sandstone,lime soil or other materials in densely inhabited areas without taking any measures for fire and dust prevention. 未采取防燃、防尘措施,在人口集中地区存放煤炭、煤矸石、煤渣、煤灰、砂石、灰土等物料的。
- Conclusion:Semiaquilegia adoxoides grows best on black lime soil and sandy soil.The roots output is the highest wher use nitrogenous fertilizer and compound organic fertilizer. 结论:紫背天葵在黑色石灰土和沙壤土中生长最好,以施氮肥和有机复合肥的产量最高。
- To assure the quality of retailing backwall fill,the paper discussed the construction technology of lime soil mixture,retailing backwall fill and side angle treatment etc. 为确保台背回填质量,采用从灰土拌和、台背回填到边角处理一整套施工工艺,保证台背压实度达到95%25以上。
- The paper mainly discussed technical measure to raise strength of soil base and frost stability in frost area. 本文主要论述提高冰冻地区零填与挖方路段土基强度冰冻稳定性采取的技术措施。
- Storing coal, coal gangue, coal cinder, coal ash, sandstone, lime soil or other materials in densely inhabited areas without taking any measures for fire and dust prevention. (四)采取防燃、尘措施,在人口集中地区存放煤炭、矸石、煤渣、灰、石、灰土等物料的。
- From two angles of design and construction to analyzed factor that bring soft soil base sink, and discuss resolvent. 从设计、施工两个方面对引起软土地基沉陷的因素进行分析,并讨论解决方法。
- Article 31 When coal, gangue, coal cinder, coal ashes, sandstone, lime soil or other materials is stored in densely inhabited areas, fire and dust prevention measures must be taken in order to prevent atmospheric pollution. 第三十一条 在人口集中地区存放煤炭、煤矸石、煤渣、煤灰、砂石、灰土等物料,必须采取防燃、防尘措施,防止污染大气。
- Soil stabilized with AFS has higher early lime soils strength and better anti cracking characteristics than lime soil. AFS稳定土和石灰土相比,早期强度有了较大提高,并具有较好的抗裂性。
- Construction technique of cement lime PFA stabilized soil base 水泥石灰粉煤灰稳定粉土底基层施工工艺
- The embankment construction on the soft soil base in bridge head concernes with whether or not there are vehicle dumps between the abutment and the abutment back embankment. 桥头软基路堤施工关系到桥台与台背路堤间是否出现跳车现象的问题。
- When coal,gangue,coal cinder,coal ashes,sandstone,lime soil or other materials is stored in densely inhabited areas,fire and dust prevention measures must be taken in order to prevent atmospheric pollution. 在人口集中地区存放煤炭、煤矸石、煤渣、煤灰、砂石、灰土等物料,必须采取防燃、防尘措施,防止污染大气。
- On construction technology of cement lime PFA stabilized soil base 浅议水泥石灰粉煤灰稳定粉土底基层施工工艺
- The urease activity of lime soil showed a vertical distribution law, and it was obviously decreased from plough layer to plowpan, while it was slowly decreased from plowpan to bottom layer. 石灰土脲酶活性呈垂直分布规律,从耕作层到犁底层下降明显,从犁底层到底土层下降缓慢。
- This paper analyzes the origin of solution cavern of the dispersive soil dyke and points out the treatment measures utilizing complex geomembrane and lime soil to deal with dispersive soil dyke. 分析了分散性粘土堤坝溶洞成因,提出了复合土工膜和白灰土处理分散性粘土堤坝的措施。
- The feasibility and mechanism analysis of a penetrable pipe for soil base in the field used to irrigate and drain was disccued by mpns of the analyais of present underground irrigation systems. 通过对现有地下灌溉系统的分析,论述了田间地下土基透水管灌溉、排水兼用的可行性及机理分析。
- The increment of praline content and SOD activity in the seedlings raised in organic soil base was more than that in the seedlings raised in nutritional soil base under moderate drought stress. 在中度干旱胁迫条件下,有机基质所育秧苗水稻叶片的脯氨酸含量和SOD活性增加的幅度大于营养土所育秧苗。
- We may burn limestone to obtain lime. 我们可以通过烧石灰石来得到石灰。