您要查找的是不是:
- lime soil base course 灰土基层
- Analysis of the Standard Test Result for Lime and Flyash Soil Base Course 对二灰土底基层标准试验结果的分析
- Such crops won't grow in limy soil. 这类作物不能在石灰质的土壤中生长。
- Comparison research on Aggregate Grain Size for Cement Stabilized Soil Base Course Respectively Required in Construction Technical Standards of China and the United States 关于中美技术规范对水泥稳定土基层骨料粒径要求的对比研究
- The cement stabilized aggregate and the lime fly ash stabilized aggregate are two typical semi-rigid base course materials. 水泥稳定粒料和二灰(石灰、粉煤灰)稳定粒料是两种典型的和常用的半刚性基层材料。
- stabilized soil base course 稳定土基层
- Reusing test study on phosphogypsum-lime solidified soil in road base course is carried out to solve engineering diseases caused by the overuse of phosphogypsum in highway. 摘要针对道路建设中过量使用磷石膏并引发工程病害的问题,进行了既有富含磷石膏二灰土底基层的改良再生研究。
- Storing coal,coal gangue,coal cinder,coal ash,sandstone,lime soil or other materials in densely inhabited areas without taking any measures for fire and dust prevention. 未采取防燃、防尘措施,在人口集中地区存放煤炭、煤矸石、煤渣、煤灰、砂石、灰土等物料的。
- Conclusion:Semiaquilegia adoxoides grows best on black lime soil and sandy soil.The roots output is the highest wher use nitrogenous fertilizer and compound organic fertilizer. 结论:紫背天葵在黑色石灰土和沙壤土中生长最好,以施氮肥和有机复合肥的产量最高。
- To assure the quality of retailing backwall fill,the paper discussed the construction technology of lime soil mixture,retailing backwall fill and side angle treatment etc. 为确保台背回填质量,采用从灰土拌和、台背回填到边角处理一整套施工工艺,保证台背压实度达到95%25以上。
- Storing coal, coal gangue, coal cinder, coal ash, sandstone, lime soil or other materials in densely inhabited areas without taking any measures for fire and dust prevention. (四)采取防燃、尘措施,在人口集中地区存放煤炭、矸石、煤渣、灰、石、灰土等物料的。
- The paper mainly discussed technical measure to raise strength of soil base and frost stability in frost area. 本文主要论述提高冰冻地区零填与挖方路段土基强度冰冻稳定性采取的技术措施。
- Construction Process and Quality Control for Base Course of Zhongshan Section of National Highway No. 国道中山段路面基层施工工艺与质量控制。
- Article 31 When coal, gangue, coal cinder, coal ashes, sandstone, lime soil or other materials is stored in densely inhabited areas, fire and dust prevention measures must be taken in order to prevent atmospheric pollution. 第三十一条 在人口集中地区存放煤炭、煤矸石、煤渣、煤灰、砂石、灰土等物料,必须采取防燃、防尘措施,防止污染大气。
- Base; road base [highways]: The part of the road structure below the base course and above the sub-base. 路床[公路]:基层之下底基之上的道路结构部分。
- From two angles of design and construction to analyzed factor that bring soft soil base sink, and discuss resolvent. 从设计、施工两个方面对引起软土地基沉陷的因素进行分析,并讨论解决方法。
- Soil stabilized with AFS has higher early lime soils strength and better anti cracking characteristics than lime soil. AFS稳定土和石灰土相比,早期强度有了较大提高,并具有较好的抗裂性。
- The results indicate that using cement stabilized aeolian sand and macadam, as base course for road is feasible. 试验结果表明,水泥稳定风积砂碎石做基层在公路上的应用是可行的。
- Coal gangue can be used as pavement base course materials of the roads in mining area. 在矿区道路建设中,煤矸石可以做路面基层材料使用。
- When coal,gangue,coal cinder,coal ashes,sandstone,lime soil or other materials is stored in densely inhabited areas,fire and dust prevention measures must be taken in order to prevent atmospheric pollution. 在人口集中地区存放煤炭、煤矸石、煤渣、煤灰、砂石、灰土等物料,必须采取防燃、防尘措施,防止污染大气。