您要查找的是不是:
- landfill site closure 封场
- Closure cover system is one of important parts of landfill site construction, it includes landfill gas discharge guid ing layer, geotechnical film, drainage layer and plant cover surface soil layer. 封场覆盖系统是垃圾卫生填埋场建设的重要组成部分,覆盖系统包括气体导排层、土工膜、排水层、植被表土层。
- Xikengwei Refuse Landfill Site Construction Given the go-ahead. 西坑尾垃圾填埋场将全面动工。
- Exploration of Landfill Site Leachate Treatment Technology. 垃圾填埋场渗沥水处理技术探讨。
- The protesters were angry at the government plans to reopen a local landfill site. 第2章 模拟试题
- During the first year we hired a truck every three months to take garbage to a landfill site in Huairou. 在第一年,我们每三个月雇一辆卡车将垃圾运到怀柔的一个销纳场,month.
- The stability is one primary problem of construction waste landfill site engineering. 稳定性是建筑垃圾填埋场工程的主要问题之一。
- The results show that the region nearby the waste landfill site hasbeen polluted. 结果表明,垃圾场已对周围环境造成二次污染。
- This paper studies the stabilization of Zhaojiagou Landfill site in Shenyang,which has been closed for 2 years. 对沈阳市一个关闭2年左右的垃圾卫生填埋场的稳定化状态进行了研究。
- It has been found that LFG is a potentially danger for the buildings near the landfill site. 测试结果表明,填埋气体的横向迁移现象明显,对周围建筑物安全具有潜在的威胁。
- The hazardous waste that cannot be treated on-site will be collected and treated in central treatment and disposal facilities such as the new landfill site to be built. 不能就地安全处理处置的危险废物全部集中处理,建成危险废物集中填埋场。
- If we continue to overlook the increasing waste in Guangzhou, it is likely that Guangzhou will become a huge landfill site sooner or later. 如果我们继续无视广州日益增多的垃圾,有可能不久的将来广州将成为巨大的垃圾填埋场。
- Separate tables are required for the WWTP and SW landfill site, in which the mitigation measures for wastewater sludge and solid waste leachate. 除上述总表外,针对污水处理厂和垃圾填埋场项目要求单独列表,详细说明污水污泥和垃圾渗滤液的环境缓解措施。
- Analysis compactors using on Shenzhen Waste Landfill Site, the imported compactor is more economical than the bulldozer produced in China. 对深圳市下坪垃圾填埋场使用的压实机械进行了分析比较,说明进口专用的压实机械比国产推土机经济性能良好,适于进行压实作业。
- As landfill site working,biochemical process and seepage of leachate always affect and change drainage layer permeability. 垃圾填埋场运行过程中,渗滤液的渗流和生物化学作用,不断影响和改变着排水层的渗透性能。
- The bags should be transferred to an enclosed and lockable skip for transit to the appropriately licensed landfill site. 应将这些垃圾袋装入密闭式,可上锁的倒卸车,然后运到恰当的,经许可的回填场地。
- The paper introduced the operation and mechanical maintenance in Xiaping landfill site,illustrating an effective way for land fill maneqement. 介绍了下坪固体废弃物填埋场的垃圾填埋作业和机械维修保养工作,说明了如何对现代化的垃圾填埋场进行有效的管理。
- Seepage-control system and operation road of Valley-Type landfill site were mainly introduced combining writer's design experience. 结合作者的设计经验,介绍了山谷型垃圾填埋场的防渗系统和作业道路的设计。
- Lo, Huang-Mu. 2000. PhD thesis. The impact of increasing the incinerator bottom ash content on landfill site biostabilisation. University of Southampton , United Kingdom . 罗煌木.;2002
- The railway is under threat of closure. 那条铁路有停止运营的迹象。