您要查找的是不是:
- Keywords integrated batch planning;integrated scheduling plan;Lagrangian relaxation technology; 一体化批量计划;一体化调度计划;拉格朗日松弛技术;
- integrated scheduling plan 一体化调度计划
- After crossover and mutation operations, an optimal or suboptimal scheduling plan can be found.The result of the test shows that this method is feasible and efficient. 结果表明此算法有很好的收敛精度,是可行的,与传统的调度算法相比较,体现出其明显的优越性。
- The FLGS algorithm presented in this paper is the first practical integrated scheduler which provides provable performance guarantees at a speedup of 2. 之所以港口层次公平的假设,是非常重要的是可以理解的,从第四节。
- Comprehensively considered the characters of scheduling problem in iron and steel enterprise, a steelmaking-casting-rolling integral scheduling method based on CSP was designed by means of object-oriented design pattern. 摘要综合考虑钢铁企业调度问题的特点,利用面向对象的设计模式,提出了基于约束满足方法的冶、铸、轧一体化生产调度方法。
- I integrated your suggestion with my plan. 你的建议使我的计划完整了。
- STC schedule plan is worked out scientifically with WBS, CPM and Gantt methods in schedule management, thus transforming the former management of “clapping head” model. 在进度管理中运用WBS、关键路线法、甘特图等方法科学地制定STC项目进度计划,这就改变了以往拍脑袋管理的模式;
- Study of integrated scheduling and control system for process industry 流程工业生产调度与控制集成系统研究
- He has never dissatisfied with this plan. 他从来没有对计划表示不满。
- Integrated scheduling system framework based on genetic algorithm and agent 基于遗传算法和代理的集成调度系统框架
- I bought a run-down farm house and plan to fix it up. 我买了一间破败的农舍,打算整修整修。
- Chapter 3 of this thesis discusses schedule management in detail, analyses some methods to make schedule plan, for example, Gantt, CMP, and PERT, points out their advantages and disadvantages. 在第三章中,就项目管理中的进度管理进行了详细的讨论,分析了进度计划的几种主要方法(甘特图法、关键路径法、计划评审技术等),并指出了这几种方法的优缺点。
- I changed my plan in deference to your opinion. 我听从你的意见,改变了计划。
- He has no intention to jack up the plan. 他没有放弃这个计划的意思。
- He was hostile to any change in our plan. 他反对我们计划中的任何改变。
- The police worked out a plan to catch the thief. 警察制定出了策略捉贼。
- His plan was opposed with fierceness. 他的计划遭到强烈的反对。
- The PSP, in contrast, provides task and schedule planning templates to monitor project progress. 相比之下,PSP提供了任务和进度计划模板用以监控项目的进展。
- The plan grew out of a casual conversation. 这个计划出自于一次非正式的谈话。
- 今日热词
-
- 深远海浮式风电平台 - deep-sea floating wind power platform
-
- 京雄高速公路 - Beijing-Xiongan expressway
-
- 农业及相关产业增加值 - the added value of agriculture and related industries