您要查找的是不是:
- The Development of Running and Fault Information Management System for Generator Sets in Power Plant 发电厂机组运行及故障信息管理系统的开发
- generator sets in power plant 发电厂发电机组
- Welding and heat treatment for middle pressure and high pressure guided-stream pipe used in generating set in power plant 电厂机组中压、高压导汽管的焊接及热处理
- After the integral DCS modification of No. 1 generator set in Zhujiang power plant, the control tactics of trip circuit for pulverizing system, test and the improvement of related circuit were introduced. 摘要介绍广州珠江发电厂1号机组dcs一体化改造后,制粉系统跳闸回路的控制策略、试验及相关回路修改情况。
- Dynamic Balancing Test Analysis of Generator Sets in Electric Power Plant 电厂发电机组动平衡试验分析
- Design Optimization about Power House Arrangement for #1,2 Generator Sets in Tai-shan Thermal power Plant 台山电厂1,2号机组主厂房布置优化设计
- Application of Soot Blower Operated by Combusting Gas Wave on 135 MW Generator Set in Yong-fu Thermal Power Plant 燃气冲击波吹灰器在永福电厂135 MW机组上的应用
- FGD Technolgy of Boilers in Power Plant of TISCO. 太钢发电厂锅炉的烟气脱硫技术。
- According to the special requirement of protective relaying setting in power plant,the development of a graph based protective relaying setting software for power plant is described. 针对发电厂继电保护整定计算的特点和要求,作者研究并开发了基于面向对象与混合编程的发电厂继电保护整定计算及管理软件。
- Seismic analysis and testing are carried out in accordance with the IEEE 344-1987 standard for the emergency generator set (EDG set) in Qinshan Nuclear Power Plant. 参照IEEE 344-1987的规范要求,对秦山核电厂应急柴油发电机组(简称EDG机组)进行抗震分析和试验研究。
- Safety Measures to Ensure On-line Parallel Operation of Single 800 MW Generating Set in Suizhong Power Plant 绥中800 MW机组单机送华北安全技术措施
- The Energy Saving Reformation of Circulating Pump of 300 MW Generating Set in the Power Plant and Its Benefit Analysis 电厂300MW机组循环水泵节能改造及效益分析
- The pontoon is non-self-propelled. The main and auxiliary generator sets in the engine room provide enough room provide enough power for operation and livelihood. 船体为非自航式,机舱内的主副发电机组可供装卸作业与生活用电。
- The Vibration Test Analysis and Treatment for No.1 Generating Set in Xinzheng Cogeneration Power Plant of Henan Province 河南新郑热电厂1号机组振动测试分析与处理
- The pontoon is non-self-propelled.The main and auxiliary generator sets in the engine room provide enough room provide enough power for operation and livelihood. 船体为非自航式,机舱内的主副发电机组可供装卸作业与生活用电。
- The question for large generator circuit breaker (GCB) in power plant project design is the problem with different opinion in recent 10 years. 大容量火电机组发电机是否需要装设出口断路嚣(GCB),是近十几年来大型发电厂电气工程设计中争论较多,意见不一的问题。 主要原因是其目前主要依靠进口。
- She had the sapphire set in a gold ring. 她把那枚蓝宝石镶在金戒指上了。
- Spring in East China usually sets in about March. 华东的春天一般约在三月开始。
- A set of schemes for power plant NOSA information system are proposed according to the application problems of NOSA management system in power plant. 为了提高企业的质"安健环"管理水平,文章分析了以往NOSA信息系统存在的不足,提出了一套科学完善的NOSA信息化方案,并在发电企业中得到了应用。
- The Conservative Party is now in power. 现在由保守党执政。