您要查找的是不是:
- front sheet pile 前板桩
- Methods of detecting the sheet pile quay are described and the detection results are analyzed. 介绍了钢板桩码头的检测内容和相应的检测方法 ,并对检测结果进行了分析。
- The covered type of sheet pile wharf as a new type wharf is still lack of perfect design and construct norms. 遮帘式板码头作为新型的码头结构型式尚没有完善的设计与施工规范,原型监测显得尤为重要。
- Hammer not only the single pile hammer with hard combinations precast concrete plant pipe pile, steel sheet pile, the pile. 该锤不仅可单锤与桩架组合打植混凝土预制管桩、方桩、钢板桩、灌注桩。
- This paper introduces the construction and quality control of AZ steel sheet pile over water in Gaolan marine patrol base quay. 本文介绍了珠海高栏海巡基地顺岸码头工程水上施打AZ型钢板桩的施工情况和质量控制,为同类工程施工提供借鉴。
- Five microfacies sandbodies including distributary channel, mouth bar, front sheet sand, gravity flow sand and overbank sand are developed in the fan delta front. 在扇三角洲前缘主要发育水下分流河道、河口坝、前缘席状砂体、重力流砂体、水下溢岸砂体5种微相砂体。
- The problems in the free and fixed earth support methods for thd design of the anchored sheet pile wall for excavation are briefly discussed. 简要讨论了用于桩锚支护设计的自由端法与固定端法中存在的问题,提出了一种新的设计方法。
- Five types of sedimentary microfacies , such as underwater distributary channel mouth bars, front sheet and far sand bars, and front fan delta muds, are differentiated. 研究区可作为储层的砂体主要为水下分流河道砂体、河口坝砂体、前缘席状砂砂体及远砂坝砂体。不同类型的砂体由于其形成环境不同,其物性和分布有较大差异。
- The analysis is made on the design for cantilever sheet pile wall, single anchor(strut) and multiple anchors(struts) pile wall. 详细分析了基坑设计的具体内容,并对悬臂桩、单锚(支撑)和多锚(支撑)设计进行了合理分析。
- The mechanism and response characteristics of the sheet-pile groin under the impact of bore in Qiantang River has not been solved since the application of the sheet pile. 钱塘江排桩式丁坝在涌潮作用下的受力性状和响应特性一直是工程界比较关注的问题。
- In this article,author introducs the rationality of selecting Larssen steel sheet pile support in constructing underpass,elaborates the method of design and construction. 本文介绍了地下通道施工中选择拉森钢板桩支护的合理性,并对其设计方法和施工措施进行详细阐述,为今后类似工程施工提供参考。
- Sixteen sheet pile docks in China arc analyzed by using the virtual simply-supported beam method.The results are almost equal to those obtained using the software ANSYS. 应用拟简支梁法对我国板桩码头进行结构计算的结果,与通用有限元计算软件ANSYS的计算结果十分接近。
- The fan delta front sheet sand and the slump turbidite system that arecontrolled by the cascade fault landform of the actic region is the advantageous areaof seeking a section of lithologic trap of the Dongyi interval. 陡坡带断阶地貌控制下的扇三角洲前缘砂体及滑塌浊积体是寻找东一段岩性圈闭的有利地区;
- Construction of footings in water by sheet pile cofferdam method and pumping water from within the dam to settling ponds before returning it to the watercourse. 施工的脚在水中钢板桩围堰施工方法及抽水,从山峡大坝至沉降池,然后再返回到水道。
- In order to study soil-structure interaction behavior, the finite element analysis for the strip footing subjected to both vertical and lateral loads, and foundation layer reinforced with sheet pile are considered. 为研究土体-构造物的共同作用性能,利用钢板桩加强的地基基础进行了有限元分析。
- The front cover of the novel has been torn off. 这本小说的封面已被撕掉。
- Thorough exploration on the open architecture of Auto CAD and by using the developing tools provided by ACAD, a versatile and practical computer aided design system was developed for plan and design of pier on sheet pile. 对 Auto CAD(ACAD)的开放式体系结构进行深入探索 ,利用 ACAD提供的开发工具 ,结合板桩码头专业设计的特点 ,研究开发了一套多功能、实用的计算机辅助设计系统
- I drove up in front of the house and honked. 我将车开到屋子前面然后按喇叭。
- Described are features and functions of Ingersoll-rand cluste down the hole hammers and programs of construction three diaphragm walls ofdifferent structures using them, with emphasis on he sheet pile diaphragm wall construction procedure. 介绍了英格素兰公司的集束式潜孔锤的特点及性能,用集束潜孔锤施工3种不同结构连续墙的程序,着重介绍了钢板连续墙施工工序。
- in- patient medical record front sheet 住院病案首页