您要查找的是不是:
- flood risk forecasting system 洪水灾情预报系统
- Earthquake monitoring and forecasting system. 地震监测预报体系。
- A flood early warning and forecasting system, ground water monitoring system, water resources management system and hydrological data system have been established. 构建洪水预警预报系统、地下水监测系统、水资源管理系统和水文水资源数据系统。
- Thirdly, in the base of the above theory the essay established the database, developed the analysis and forecasting system of the construction risk of the deep excavation engineering, which made the risk judge easy, simple, convenient. 第三,本文在上述理论的基础上,将风险评估理论在深基坑工程进行应用,搭建了施工风险评估的数据库,开发完成了深基坑工程施工风险评估预判系统,使深基坑工程施工风险的评判直观方便简单易用。
- The New Port of New York and New Jersey Operational Forecast System. 纽约和新泽西业务预报的新端口。
- Based on above, we can get that area with high flood risk is small, but the population and GDP are relatively large. 可以看出我国的洪水高风险区面积小,而人口和GDP数值却比较高。
- Medium term and long term forecast system based on GIS has been established. 通过对其动因、特点、发展趋势和存在问题的分析,建立了基于GIS的中长期假日旅游预测系统。
- This paper analyzes the influence factors of flood formation and flood risk degree in Sanjiang Plain area. 分析了三江平原地区造成洪水的影响因素及洪水危险程度;提出了防洪减灾措施。
- A new city flood risk management(FRM) mode,government、market、public partnership(GMPP) is provided in this paper. 文章提出了新的城市洪水风险管理模式,指出洪水风险管理是准公共产品,非市场产品,公共风险。
- So gestation wardship, risk forecast and treatment are crucial for SLE woman to go through gestation safely . 因此,妊娠期监护、风险预测及处理是SLE妇女安全度过妊娠期的关键。
- In this paper,the flood risk is zoned by means of reason analysis in consideration of meteorology,runoff and topography. 本文从气象、径流和地形三因素考虑,采用成因分析的方法,制成了洪水危险程度区划图。
- The Flood Forecast System for Jiangxi Xiu River 江西省修河流域洪水预报系统
- Considering meteorology, runoff and topography, the flood risk was zoned by the method of the reason analyses in this paper. 本文从气象、径流和地形三因素考虑,采用成因分析的方法,制成了洪水危险程度区划图。
- An automatic measurement and forecasting system for pollen will provide the latest information to the public. 一种对花粉的自动测量预测系统将为公众提供最近的相关信息。
- At last, a map for flood risk grades in Hubei Province is made by overlaping the map of flood fatality grade and the map of vulnerability. 对洪水危险性等级图和社会经济易损性评价图进行空间叠加,并得到湖北省洪灾风险等级评价图。
- However, only 10% of the patients who have galactophore cancer are for genetic reasons, so the risk forecast is only available for a small part of people. 不过,与遗传有关的乳腺癌只占到所有乳腺癌得病者的10%25,所以,这项检查目前还只是对一部分病人有效。
- Chien , F.-C., B.J.-D.Jou, P.-L.Lin, and J.-S.Hong, 2004: A real-time MM5/WRF forecasting system in Taiwan . 陈正达、简芳菁、黄国展,2001:个人电脑丛集平行运算系统在大气科学数值计算应用的潜力初探。
- In this definition, flood risk can be shown by a complete set of triples and the elements of each triple have represented not ... 最后,探讨了水灾风险评估研究的问题与对其未来的展望。
- Results of testing show that the forecasting system can get evaluating scores accurately for scientific projects. 测试数据表明该系统能较准确地对科研项目作出评估得分。
- Used large sample datum to train the BP network, formed an identifiable and rememberable non-linear forecasting system. 利用大样本数据对网络进行了训练,形成了有识别和记忆功能的非线性预测系统。
- 今日热词
-
- 深远海浮式风电平台 - deep-sea floating wind power platform
-
- 京雄高速公路 - Beijing-Xiongan expressway
-
- 农业及相关产业增加值 - the added value of agriculture and related industries