您要查找的是不是:
- flag marking the control point 指挥部标志旗
- lamp marking the control point 指挥部标志灯
- On the ground, a control flag marks the location that the orienteer must visit. (我们在山里不分方向乱找,因为已经不能辨别方向了。
- Method is overridden to mark the starting point to begin tracking and saving changes to the control as part of the view state for the control. 方法以标记开始跟踪的起始点,并将对控件所做的更改保存为该控件的视图状态的一部分。
- Method is overridden to mark the starting point to begin tracking and saving changes to the control as part of the view state for the object. 方法,标记开始跟踪和保存作为对象视图状态一部分的控件的更改的起始点。
- It is the control point for railroads radiating north, east, west and south. 这是个交通枢纽,铁路由此向东西南北伸展出去。
- Marks the current frame in the call stack with a special flag indicating that all preceding frames in the control flow should not be considered for access checking. 方法是用一个特殊旗标标识调用堆栈的当前帧,指明控制流中所有前面的帧都不进行访问检查。
- He vainly tried to mark the defacing stain out. 他试图除去有损外观的污迹,但没有成功。
- Titan mode changes the control points to missile silos. 泰坦模式改变了导弹发射井的控制点。
- It introduced the framework bridge jacking beam and analyzed the control point and measures of embedded muscle process. 介绍了朔黄铁路框架桥顶进后悬臂板、刃角补墙及尾墙的施工方案,分析了植筋施工中工序的控制要点和具体措施。
- Marking the exam papers was quite a slog. 评阅试卷是很辛苦的工作。
- Neg: Reverses the movement direction of the control points. 将控制点投影方向反向。
- The control points are collinear or not well distributed. 地图配准后更新显示,出现如下错误?
- Marks the starting point at which to begin tracking and saving changes to the view state for the control. 标记开始跟踪并保存控件视图状态更改的起始点。
- Marks the beginning for tracking state changes on the control. 标记跟踪控件状态更改的起始点。
- Marks the starting point to begin tracking and saving changes to the control as part of the control view state. 标记开始跟踪的起始点,并将对控件所做的更改作为控件视图状态的一部分进行保存。
- NOTE: Although many curve models are comprised of multiple curves, you cannot adjust the control point layout of individual curves within the model. 注意:虽然许多曲线被包含在多样的曲线内,但是在模型里面不能够调整个别的曲线控制点地布置。
- The fourth part mainly discusses the design of the schedule of DBR system.Due to the difference of four control point, the control plans are different. 第四部分为本文的重点,主要讨论DBR控制点控制计划表的设计,针对四个控制点的不同情况分别进行讨论。
- The production of Gouda cheese's Key control point include ferment time ,curd time ,soft ang hard degree about the clot and the control for acidity . 高达干酪生产主要控制点包括发酵时间、凝乳时间、凝块的软硬程度以及酸度的控制。
- They marked the boundaries of the football fields. 他们画出了足球场地的边界。