您要查找的是不是:
- Boiler feed water test kit 炉水试验台
- feed water test 给水分析
- Automatically feed water for boiler. 锅炉自动给水。
- As the products of combustion circulate,they heat and feed water. 燃烧产物循环时便加热供水。
- As the products of combustion circulate, they heat and feed water. 燃烧产物循环时便加热供水。
- Disassemble,clean and check the automatic feed water regulator. 将自动给水调节器拆开、清洁并检查。
- To renew defective rivets and conduct water test in following places. 更换下列各处损坏的柳钉并做水压试验。
- To pass the water test the catalyst should not disintegrate or crumble. 经过泡水试验,催化剂应不开裂或破碎。
- This paper apply ASME "Feed Water Pump NPSH Analysis During Load Rejection" theory to check BFP NPSH of Zhuhai Power Plant 700MW Units in the condition of VWO and also confirm the calculating result by load rejection test. 利用ASME的“甩负荷时给水泵汽蚀余量的分析”理论 ,校核了珠海电厂容量 70 0MW机组在最恶劣工况即阀全开跳机工况时的给水泵汽蚀余量 ,并在甩负荷时 ,进行了试验验证。
- A second more severe water test is to place the catalyst in boiling water and observe for any disintegration. 第二个更苛刻的泡水试验是将催化剂放在开水中检查有没有开裂。
- This paper introduces the working principle, test process and setting method of the import type feed water minimal flow quantity recirculation control system, analyses various problems during test period and provides treatment method. 摘要介绍了引进型给水最小流量再循环控制系统的工作原理、调试过程和整定方法;分析了调试过程中出现各种问题的原因;并找出了解决问题的方法。
- Abstract: This paper apply ASME "Feed Water Pump NPSH Analysis During Load Rejection" theory to check BFP NPSH of Zhuhai Power Plant 700MW Units in the condition of VWO and also confirm the calculating result by load rejection test. 文摘:利用ASME的“甩负荷时给水泵汽蚀余量的分析”理论,校核了珠海电厂容量700MW机组在最恶劣工况即阀全开跳机工况时的给水泵汽蚀余量,并在甩负荷时,进行了试验验证。
- All treated water test results (both chemical and microbiological) are generally within specifications. 所有处理水的测试结果(化学和微生物)总体来说在标准范围内。
- The Watts Feed Water Pressure Regulator must be installed on the cold water supply line to the boiler. 美国瓦茨进水压力调节阀必须安装在通往锅炉的冷水供应管道上。
- Open water test and cavitation test of standard propeller 4119 are carried out in depressurized towing tank. 本文选用标准桨模4119,在减压拖曳水池进行了常压下的敞水重复试验及减压下的空泡性能试验。
- The valve shall contain a Watts Regulator Model 9D backflow preventer and Model 1156 feed water pressure regulator. 这种阀门包含美国瓦茨调节阀型号9D防倒流阀和型号1156进水压力调节阀。
- Good: All treated water test results (both chemical and microbiological) are generally within specifications. 好:所有处理水的测试结果(化学和微生物)总体来说在标准范围内。
- Filtration method is subject to feed water quality. Consult Asahi Kasei Chemicals Corporation for further information. 根据进水水质不同,可以选择不同过滤方式,有关详情请向本公司咨询联系。
- Feed Water Piping, Main Steam Piping, Reheating Steam Piping (Hot), Reheating Steam Piping (Cold). 如果指锅炉部分的给水,主蒸汽、再热(热)和再热(冷)的话,应该是:
- These indications do not correspond to a diving depth, but refer to the pressure to which the overpressure water test has been done. 但这些数字不等于潜水深度,而是指进行过压防水试验的压力。