您要查找的是不是:
- On-the-spot factory inspection will be done by technician's option textile testing and research center. 中国纺织品研究中心的技术人员将在工厂现场检验。
- Has the quality system of the factory been running more than three months before factory inspection? 生产厂质保能力工厂审核前质量体系是否正式运行三个月以上?
- Before sampling, the import entity shall provide the factory inspection report and the original origin certification. 进口单位应当在抽样前,提供出厂检验报告书和原产地证明原件。
- On the spot factory inspection will is do by technician's option textile testing and research center. 中国纺织品研究中心的技术人员将在工厂现场检验。
- To receive all factory inspection regarding to product certification such as CCC, UL, CSA, TUV, KEMA, etc. 负责所有的内销产品的3C认证等安全认证工作(术支持/证,申请,跟踪)确保产品符合国家强制标准。
- Has the quality system of the manufacturer been running more than three months before factory inspection? 工厂质保能力工厂审核前质量体系是否正式运行三个月以上?
- We declare that we follow the rules and procedures of the CSP and make payment for the fees arising from the application, testing, factory inspection and other related services. 我们声明我们将遵守CSP的认证规则和程序,支付认证所需的申请、试验、工厂审查及其它有关的费用,理解并接受CSP提出的评价活动计划。
- Whether or not the factory agrees the delegates from the factory inspection group investigate the production and management sites related with the certification products when in regular production? 8是否同意认证机构的检查员在正常生产时,经与质量保证负责人或认证联络工程师(或联络员)接洽后,可以进入涉及认证产品生产及管理的所有场所?
- Conduct in factory inspection and audit 工厂验货和查厂
- It is now our aim to set up a factory. 我们现在的目的是创办一座工厂。
- The Questionnaire For Factory Inspection 工厂审查调查表
- Expected date of factory inspection arrangement 建议安排审核的时间
- Unconventional Requisition for Factory Inspection 非常规工厂审查审批表
- The latest Factory Inspection Report No 最近一次的制造厂审查报告号
- Date of factory inspection expected 希望安排检查的时间
- UL do Brasil is an INMETRO accredited test agency for medical equipment and can provide the mandatory product certification and factory inspections required by the regulations. UL巴西分公司是经INMETRO认可的认证机构,可对医疗器械进行认证并提供法规要求的强制性产品认证服务和工厂验厂服务。
- Valid Factory Inspection Report No(if any) 有效的工厂审查报告号(如有)/
- Jack was assigned to the assembly shop of the factory. 杰克被分配到厂里的装配间工作。
- He piloted us through the large factory. 他领我们参观了这个大工厂。
- Shall we go down to the question of inspection? 我们谈一下商品检验问题好吗?