您要查找的是不是:
- The face slab rockfill dam of Shuibuya Hydropwer Station is the highest one being built in the world at present. 水布垭水电站混凝土面板堆石坝,属目前在建的世界第一高面板堆石坝。
- high concrete face slab rockfill dam 高面板堆石坝
- face slab rockfilled dam 面板堆石坝
- Flood control design for construction stage of Qinshan Face Slab Rockfill Dam 芹山电站面板堆石坝施工期坝体过水渡汛设计
- Construction of crushing side wall in concrete face slab rockfill dam of Shuibuya 水布垭混凝土面板堆石坝挤压边墙施工技术
- The Research of Foundation Treatment Measures for River Bed Toe of Face Slab Rockfill Dam of Baimei Reservoir 白眉水库面板堆石坝河床趾基处理措施的研究
- concrete face slab rockfill dam 混凝土面板堆石坝
- The crushing side wall is used the upstream consolidation slope measures of rockfill dam with concrete face slab. 混凝土面板堆石坝采用挤压边墙作为大坝上游固坡措施。
- Faced slab rockfill dam 面板堆石坝
- rockfill dam with concrete face slab 面板堆石坝
- Based on the design of Hanpingzui rockfill dam with concrete facing slab, the stresses and deformations of the dam body and impervious system are calculated by using the elastoplastic plane finite element method. 摘要根据汉坪咀混凝土面板堆石坝的工程设计,用弹塑性平面有限元法,计算了堆石坝坝体、防渗体系的应力和变形。
- Rockfill dam with face slab construction of Lianhua water power station 莲花水电站面板堆石坝坝体填筑施工
- Construction of slab joint seal for concrete slab rockfill dam 混凝土面板堆石坝面板接缝止水施工
- Comment on explosion experiment results of main pile stone of rockfill dam about Shuibuya face slab 水布垭面板堆石坝主堆石料爆破试验成果评析
- Study on the crack mechanism of face slab of concrete face rockfill dam and its prevention measures 面板堆石坝面板开裂机理与防止措施研究
- Construction Quality Controt of Rockfill Dam with Facing Slab in Dahe Reservoir 大河水库面板堆石坝工程施工质量控制
- Influence of Facing Slab on Free Vibration Characteristics of Rockfill Dam 防渗面板对堆石坝体自振特性的影响
- With the development of concrete face slab dam, the upstream slope construction is a key factor affecting the schedule and quality of construction. 在混凝土面板坝的发展过程中,上游坡面的施工始终是一个控制进度和影响质量的关键环节。
- Face slab anti-cracking of concrete faced rockfill dam using polypropylene fibrous concrete 混凝土面板堆石坝的面板防裂与聚丙烯纤维混凝土
- Strictly control the total deformation of dam body, especially the deformation after reservoir impoundment, is the most effective measure for avoiding concrete face slab rupture. 严格控制坝体的总体变形,特别是控制蓄水运行后的坝体变形,是避免出现面板挤压破坏的最有效手段。