您要查找的是不是:
- The main advantage of our design methodology is that it can be easily integrated into the ECO (Engineering Change Order) stage in the existing ASIC design flow. 我们所提出之设计方法的主要优点,在于它可以整合于现有ASIC设计流程中的ECO部分。
- Update manufacturing orders as necessary by monitoring system inquiries and new engineering change orders. 通过监视系统需求和新的工程变化订单来更新生产订单。
- CAD ECO Engineering Change Order 工程更改单
- Advance Engineering Change Order 前方工程变更命令
- 6. In charge of the implementation of ECOs (engineering change order) in the plant. Maintain technology document and BOM in WINCHILL system. 负责工程更改通知单的执行。在系统里维护技术文件和材料清单。
- Familiar with Engineering Change Control process. 熟练掌握工程更改控制流程。
- Track quality for the engineering change parts. 对工程变更件产品的质量追踪。
- Take the lead of engineering change about product. 负责领导产品方面的工程变更。
- Control of product engineering change. 产品工程变更之管制。
- engineering change order (ECO) 反馈修正
- engineering change order 技术更改指令
- Coordinate Engineering change timing with related parties. 与相关部门就工艺变更日程进行协调。
- It can change order set numbers and overrelaxation parameters expediently according to real need. 该方法综合了上述两种算法的优点,具有可根据需要灵活改变子集数和超松弛因子的功能。
- R.F.Cushman &S.D.Butler,Construction change order claims 2-4,Aspen publishers online,1994. 王义云、各业会计制度(修订版),五南图书出版公司,台北,1995。
- Coordination and implementation of Engineering changes. 工程改变的协调及补充.
- Maintenance of the Shop Order, achieve Customer Spec changes and Product engineering changes. 产品定单的维护,完成客户规格更改和产品工程更改;
- For example, a manufacturing workstation may submit a request to withdraw a part from inventory just before a change order makes the part obsolete. 例如,生产工作站可能恰好在更改命令弃用某个零件之前提交了一个请求,用以从库存中提取该零件。
- XXX shall comply with each CHANGE Order as if it was a term of this Agreement and subject to all its conditions except as amended by the CHANGE Order. XXX应遵守各变更单,就如同它是本协议的一项条款,并遵守其所有条件,经变更单修正的除外。(请指正,重点是标红句)。
- Perform contract, supervise contract execution, and deal with change orders. 履行合同义务,监督合同执行,处理合同变更。
- Job PurposeTo manage control and administer all Engineering Change activities within the Engineering dept. 负责工程部门所有工程变更活动的控制和管理。