您要查找的是不是:
- engineering change log 工程更改记录
- Added Change Log since candidate recommendation. 增加了候选标准版以来的修改日志。
- Familiar with Engineering Change Control process. 熟练掌握工程更改控制流程。
- Track quality for the engineering change parts. 对工程变更件产品的质量追踪。
- Take the lead of engineering change about product. 负责领导产品方面的工程变更。
- Control of product engineering change. 产品工程变更之管制。
- The change log information may be invalid or incompatible with Communicator. 更改运行记录信息可能无效或与通信器不兼容。
- Coordinate Engineering change timing with related parties. 与相关部门就工艺变更日程进行协调。
- Communicator is unable to replicate the directory because the server's change log information is incomplete. 通信器无法复制目录,因为服务器的更改运行记录信息不完整。
- The number of times FRS has initiated a read on the NTFRS change log. Each volume has its own change log. 在NTFRS更改日志上FRS初始读取的次数。每个卷都有其自己的更改日志。
- Office Outlook 2007 is an example of an external application that uses the change log to synchronize documents and list items for offline access. Office Outlook 2007就是一个外部应用程序,它使用更改日志同步文档和列表项以供脱机访问。
- The Change Manager will open a hange Request'in the Change Log and record whether or not a change feasibility study is required. 变更经理将不会在变更日志中打开一份变更申请并记录是否需要一个变更可行性研究。
- Coordination and implementation of Engineering changes. 工程改变的协调及补充.
- Job PurposeTo manage control and administer all Engineering Change activities within the Engineering dept. 负责工程部门所有工程变更活动的控制和管理。
- ECMA Electronic Component Manufacturer Association ECN Engineering Change Notice. 工程更改通知工程需要更改或发表说明时使用的文件。
- The change log is based on precise indexing of items that have changed, which provides search results more quickly and with lower overhead. 更改日志基于对已经更改的项的精确索引,可以更快地提供搜索结果,而且开销更低。
- Update manufacturing orders as necessary by monitoring system inquiries and new engineering change orders. 通过监视系统需求和新的工程变化订单来更新生产订单。
- Is a formal engineering change procedure implemented? Briefly describe the process. 是否实施工程更改操作?简要描述该过程。
- PLM vendors with a PDM background have long had interfaces to ERP systems to handle engineering change notices. PDM背景的PLM软件商早就设计了ERP系统交互界面来处理工程变更通知。
- Process and line set all engineering change notices for timely, accurate, cost effective implementation into production. 及时处理工程变更通知,将精确的、有效的成本执行到生产工作中。