您要查找的是不是:
- Determination of earthquake risk areas 危险区判定
- Basic characteristics of ambient shear stress field and forecasting study of future earthquake risk area in Guangxi and its neighboring region 广西及邻区环境剪应力场基本特征与未来地震危险区预测研究
- critical earthquake risk arean. 地震重点危险区
- earthquake risk area 地震重点危险区
- Intravenous MCE can be used to detect the savage myocardium of the risk area. 经静脉心肌造影可以识别冠状动脉阻断后危险区内存活心肌。
- Aftr the Great Wenchuan Earthquake,earthquake insurance has become a focus.There is huge earthquake risk in China. 汶川大地震发生后,地震保险成为人们关注的一个焦点。
- Testing should be focused on high risk areas. 测试应当集中在高风险的区域。
- Japan, for example, has issued natural catastrophe bonds or swaps to offset earthquake risk. 以日本为例,它已发行了自然灾害债券或掉期工具,用以抵消地震带来的风险。
- The analysis methods of earthquake risk of buried pipeline could be divided into theoretical approach and empirical approach. 埋地管道的地震危险性分析方法可以分为理论分析法和经验统计法。
- EARTHQUAKE RISK IN CENTRAL AREA OF JILIN PROVINCE 吉林省中部地区地震危险性研究
- Completes disperses the shift work take the external tourist and the work personnel as the key risk area personnel. 做好以外来游客和务工人员为重点的危险区域人员疏散转移工作。
- The weighted coefficients can indicate r elative intensity of regional crustal related movement.It is one of the time cr iterions of earthquake risk assessment. 而地壳垂直形变场的时间权系数能够表示区域地壳运动的相对强弱,它可以作为区域地震危险性判定的时间判据。
- Foster a sense of caution and urgency concerning risk areas. 养成对风险区域的谨慎意识和强烈关注。
- The land types are of transportation, farm-land and inhabitation.The moderate risk area locates in the transitional regions of the districts in Daqing. 中级风险区主要分布于大庆市各区周边的过渡地带,土地利用类型主要为未利用地,还有小部分的耕地和水域。
- Using CORA-3 algorism of pattern recognition and Fesherls discriminant function, the 38 historical earthquake areas and 22 areas needed to be identified for earthquake risk are classified and predicted. 利用图象识别的CORA-3算法与费歇尔判别函数,对华北历史上已发生的38次地震和22个待预测区进行了分类和预测。
- A graphic system computer program ERA has been developed on FACOM-M380 to estimate the earthquake risk at any place in China based on the simple Poisson model and Chinese historical earthquake data. 本文介绍在日本东京大学生产技术研究所FACOM-M380计算机上建立的地震危险性分析图形系统ERA。
- Seismotectonic method was used to research seismogenic structures, the potential maximum earthquake in the structure and estimate the next limit earthquake risk of engineering site. 地震构造法是通过研究工程场地周围每一发震构造及最大潜在地震来确定场地未来的极限地震危险性。
- Using the loess seismic subsidence distaster predicting method and the results of earthquake risk assessment, the seismic subsidence on loess sites were discriminated and evaluated. 利用黄土震陷灾害预测方法和该地区黄土场地地震危险性分析结果,对该公路沿线黄土场地的震陷区进行了判定和评价。
- The authors suggested that at the present condition,exterminating rat still was the major measure in the control of HFRS,vaccination was only the supplemen-tary measure in the risk area. 作者认为在目前条件下,出血热防制仍应以灭鼠为主,疫苗免疫接种只能作为高发区的辅助措施。
- So my primary goal is to make the LAD look perfect and if the side-branch is pinched, if the patient is assymptomatic, I might treat that medically because it is a small risk area. 所以,我的首要目标是保证左主干没问题,如果侧枝收缩了,而患者没有症状,我会用内科药物治疗,因为这只是一个低风险区域。