您要查找的是不是:
- earth and rock fill dam 土石坝
- A Re-Analysis Model for the Point Piezometer Used in an Earth and Rock Filled Dam 土石坝点式测压管资料反演分析模型
- The application of geomembrane in seepage prevention of soil and rock fill dam 土工膜在土石坝坝体防渗中的应用
- The downward sliding of a relatively dry mass of earth and rock. 地滑一堆相对来说干燥的泥土和岩石的向下滑动
- It is RCC double-curvature cofferdam in the upstream of dam ,and the cofferdam in downstream is earth and rock overflow cofferdam. 大坝上游为全断面碾压混凝土双曲拱围堰,下游为碾压混凝土护面的土石过水围堰;
- The measurement of actual works also explained that the use of compound geotextile in rock fill dam surface can reduce the amount of leakage water by 60%, the effects of imperviousness are obvious. 此外,实际工程观测也说明,砌石坝构筑复合土工膜坝面防渗体后,漏水量减少了60%25,防渗效果良好。
- The key link of embankment dam construction is fil ling and compacting of earth and rock materials and the compaction quality d epends on whether the compacting standard is properly executed. 土石坝施工的核心是土石料的填筑压实,压实质量的好坏,关键在于能否正确执行压实标准。
- rock fill dam with concrete face slab 混凝土面板堆石坝
- rock fill dam with gravel-soil core 砾石土心墙堆石坝
- concrete face-slab rock fill dam 混凝土面板堆石坝
- The soldiers covered the roof with earth and rock, thick enough to shelter them from gunfire. 士兵们用泥土和石块盖住屋顶,其厚度足以掩护他们不受炮火的袭击。
- concrete rock fill dam with face slabs 混凝土面板堆石坝
- This means that approximately 10 million tons of earth and rock would be hurled upward from the earth's surface. 这意味着将从地面掀起近一千万吨的土壤与岩石。
- The soldiers covered the roof with earth and rock,thick enough to shelter them from gunfire. 士兵们用泥土和石块盖住屋顶,其厚度足以掩护他们不受炮火的袭击。
- FIFTY MILLION TONS OF EARTH AND ROCK WERE EXCAVATED AND TWO TEMPORARY DAMS WERE CONSTRUCTED TO HOLD THE RIVER AT BAY. 为了修建导流渠,总共挖掘出了五百万吨土石,还修建了两座临时水坝来阻挡河水。
- Landform southeastern forest areas for earth and rock, the western loess hilly region along the River Valley. 地貌东南部为土石森林区,西部为黄土丘陵区,沿川为河谷区。
- Design of rock fill dam with facing on sand and gravel foundation 沙卵石地基上的面板堆石坝设计
- A New Technique for Construction of Rock Fill Dam With Face Slabs 面板堆石坝垫层施工新技术
- Dynamic centrifuge model test for concrete face rock fill dam 混凝土面板堆石坝动态离心模型试验研究
- Overlap, which rise amid the mountains, ravines crisscrossing the surface for the earth and rock structures, most of shrub cover, forests, animal husbandry appropriate. 山地峰峦重叠,沟壑交错,表层为土石结构,大部分为灌木覆盖,宜林适牧。