- earned value theory 挣值理论
- Integrated cost/schedule control using the earned value technique. 综合成本/进度控制与挣增值技术。
- The theory of labor is the basis of labor value theory. 劳动理论构成劳动价值理论的基础。
- Value theory for measuring value of forest resources. 森林资源货币计量中的价值论基础。
- Earned value analysis is always specific to a status date that you choose. 盈余分析始终与所选的状态日期相对应。
- Axiology and value theory rose with the emergence of modem psychology. 摘要哲学价值论在19世纪末的兴起有其特定的心理学背景。
- The labor value theory of Marx is the cornerstone of whole plutonomy. 马克思的劳动价值理论是整个政治经济学的基石。
- In the Available fields list, select the Earned Value fields that you want to display, click Show, and then click OK. 在“可用域”列表中,选择想显示的盈余分析域,单击“显示”,然后单击“确定”。
- To see project and task-level earned value totals in tables, on the View menu, click More Views. 要在表中查看项目和任务级别的总盈余,请在“视图”菜单上单击“其他视图”。
- Earned value (earned value: A measure of the cost of work performed up to the status date or current date. 盈余分析(盈余分析:对到状态日期或当前日期为止已完成工作量的成本的度量。
- EVM (Earned Value Management) is a practical and integrated tool to control schedule and cost. 挣值管理是一个很好的进度与成本的集成项目管理工具。
- Analyze earned value calculations, including budgeted cost of work performed (BCWP), schedule variance (SV), and cost variance percent (CV%). 分析盈余分析计算,包括已完成工作的预算成本(BCWP)、日程差异(SV)和成本差异百分比(CV%25)。
- Deepening the cognition on safety value theory has great practical significance. 安全价值理论认识的深化具有很大的现实意义。
- Performance reporting focuses on examining earned value analysis to determine whether cost overruns will require budget revisions. 绩效报告侧重于净值分析,以决定费用是否超支,是否需要调整预算。
- The following fields represent all the earned value currency fields (currency field: A type of field whose content is expressed as a cost. 以下域代表Microsoft Office Project中的所有盈余分析货币域(货币域:一种其内容表示为成本的域。
- Earned Value Management (EVM).A method for integrating scope, schedule, and resources, and for measuring project performance. 实获值管理----一种整合范畴、时程、资源以衡量专案成效的方法。
- The earned value technique measures performance of the project as it moves from project initiation through project closure. 实现价值技术从项目的启动开始一直到项目收尾结束始终测量项目的实施结果。
- The value theory system expounded in"Das Kapital" is actually "productivity value theory". 《资本论》展述的价值理论体系实际是“生产力价值论”。
- The earned value management methodology also provides a means to forecast future performance based upon past performance. 实现价值管理技术的方法还是根据过去的实施结果预测未来绩效的一种手段。
- Traditionally, philosophy has been partitioned into three areas: epistemology, metaphysics, and value theory. 哲学在传统上分为三个领域:认识论、形而上学和价值理论。