您要查找的是不是:
- ear pressure test 耳压试验
- Cylinder Compression Pressure Test. 汽缸压缩压力测试。
- Hold each pressure test for 10 minutes. 每次试验稳压10分钟。
- The depository for pressure test apparatus. 压力试验用具放置处
- Full pressure test the ram preventers. 对闸板防喷器进行全压试压。
- Associated pipework pressure test certificate. 附属喉管压力试验证明书。
- Bibbles-tight sesling with no leakage under the pressure test. 达到完全封闭,气体实验泄漏为零。
- Reassemble top-works, install valve, and pressure test. 重新组装顶部工作部件,安装阀门,进行压力测试。
- Hereby the fresh water should be used in the pressure test. 因此水压试验时只能用洁净的水进行。
- Record all pressure tests on a chart recorder. 用试压表记录试压记录。
- Safety valve to be pressure tested. 安全阀应做压力试验。
- Pressure testing of VPN (Virtual Private Network). VPN的压力测试,请问这样翻译对吗?
- What's to be done after water pressure test? Acid flushing or galvanizing? 水压试验后怎么处理,是酸洗还是镀锌?
- Middle ear pressure transformation therapeutics 中耳变压疗法
- The pipe system had passed the acceptance air pressure test performed by the installing contractor. 管道系统已经通过了安装公司所做的空气压力测试。
- Use this test in conjunction with the Fuel Pump Pressure Test and Fuel Pump Capacity Test. 与油泵压力测试和油泵容量测试一起进行该测试。
- Cross and angry words in family grate upon the ear. 不高兴与生气的话在一个家庭里令人不愉快。
- Does Operator have policy to pressure test cargo piping at intervals no greater than 12 months? 经营人有否政策以不超过12个月的间隔试压货管?
- This music's easy on the ear late at night. 这音乐夜晚听起来很好听。
- The pressure test is over. Now decrease the pressure, dismantle the pipe and check the inside of the pipe. 压力试验通过了,把压力放掉,拆开管子,检查管子内部。