您要查找的是不是:
- To do so, unbolt the relief valve and turn the relief valve discharge port to the opposite side. 带测试旋塞的闸阀安装在防回流阀的进口一侧。
- Lighterage at the discharge port, if any, shall be at the Seller's risk and expenses. 卸货港驳运所有费用和保险由卖方负担。
- The chute feeder can be installed on the ground or onto discharge port of ore bin. 槽式给料机可以架设于地面,也可以吊装在矿仓卸料口上。
- The delivery of Mazut M100-75 shall be specified by the buyer at the designated discharge port. 重油M100-75的发送买方明确指出至指定的卸货港。
- Buyer shall be entitled to have DRAFT SURVEY conducted by SGS or another independent international inspection agency at the Discharge Port, at its own expense. 买方有权以自费方式指派代表人参与船身吃水鉴定,且船公司得接受其意见,并共同决定鉴定结果。
- The dried materials will drop from the last layer of the drying plate to the bottom layer of the shell body, and will be moved by rakes to the discharge port. 已干物料从最后一层干燥盘落到壳体的底层,最后被耙叶移送到出料口排出。
- This term cannot be listed in a L/C.you can only stipulate the latest shipment.Unless you put N.O.R at the discharge port as one of the necessary documents for L/C. 信用证不能列这种条款的;只能说发运最后期限.;并且告诉客户假如船期过了造成信用证不符合点;你们作为开证人是不会接受这样的不符合点的
- What is the maximum draft allowed at discharging port? 你们到达卸货港所允许的最大水尺是多少?
- SELLER to notify BUYER within 3 days after completion of loading giving details Number, Name of Commodity, Gross Weight, Loading Date, Name of vessel, approximate Invoice value, and ETX at Discharge Port. 卖方应于货物装载完成后三个工作日内通知买方,内容应详细注明合约编号,商品名称,毛重,装运日期,船舶名称,发票概约值,到达卸货港的预估日。
- At discharging port, discharging rate shall be: a CQD term not applies. 卸货率以中国港口正常的CQD惯例卸货,
- Bills of Lading must specify the name of loading port and discharging port. 海运提单上必须标明装运港和卸货港。
- The traditional flow theory of single-acting vane pump does not take the compressibility and the reverse flow of the oil in the discharge port through the relief groove into account. 摘要由于单作用叶片泵流量特性的传统分析方法没有考虑油液的可压缩性和卸荷槽回冲流量的影响,由此得出的结论与实际情况相差甚远。
- To calculate discharge port pressure,this article considers the influence on frictional pressure drop in the gas and liquid two-phase flow between rod and tubing owing to rotation of rods. 在计算排出口压力计算过程中,考虑了由于抽油杆柱旋转引起杆管环空气液两相流摩阻的影响。
- At discharging port at the time of discharge, CIQ shall take representative samples in accordance with the prevailing standards. 在卸货港卸货期间,由CIQ取样检测,卖方或买方代表经买方许可有权出现在现场进行监督,费用由卖方承担。
- Shall we have a talk on the port of discharge this afternoon? 咱们今天下午是不是谈谈卸货港的问题?
- In the case of absence of original bill of lading at discharging port, Seller confirms to discharge the cargo against buyer's letter of indemnity in standard PNI club wording. 这句话是否可以翻译成:装卸准备完成通知在24小时内;不管白天或夜晚的任何时间到达卸货港.
- CIQ certificate of quality and weight issued at discharging port shall form the basis for final invoice. 卸货港检验检疫局出具的质量和重量证书将作为最终发票的依据。
- One original and one copy of statement of vessel arrival issued by shipping agent at discharging port. 由船公司在卸货港的代理出具的承载船舶已经到达目的港的声明,正本一份,副本一份。
- Time lost due to waiting for berth available at Discharging Port , in case the laytime commences, shall be counted as the laytime. (c)在卸港由于等待泊位而损耗的时间,如果已开始起计装卸货时间,则计在装卸货时间之内。
- How long will the discharge of the cargo take? 卸货需要多久?