- This paper analyzes hazards of changing desulfur tower packing using job hazard analysis,and makes out the count-measures to ensure the safety of construction process. 运用工作危害分析对脱硫塔更换填料中的危险进行了分析,制定了相应对策,保证了施工过程的安全。
- Also, the enhancement on desulfurizing efficiency by added moisture and axial central temperature distribution of desulfurizing tower are detailed. 还研究分析了增湿水对脱硫的强化作用以及脱硫塔轴向中心温度分布等情况。
- Because of the lack of research, many desulfurating tower had to be removed and then rebuilt after fire hazard, which has caused great economic loss. 由于这方面的研究甚少,相当数量的火灾后吸收塔被拆除重建,造成重大经济损失。
- The design process commences in shape,size and arrangement and uses CFX to simulate the variation of the flow field inside corresponding desulfurizing tower. 利用CFX软件模拟了破碎机构的形状、尺寸及排列方式等对气固接触的影响。
- The analysis of the cause for block-up in the desulfuration tower and raises some counte measures 栲胶法脱硫堵塔原因分析及预防措施
- The bell tower is the emblem of this city. 这座钟楼是这个城市的象征。
- There is a sonorous bell in the tower. 塔里有一口洪亮的钟。
- The tower on the hill brooded above the village. 小山上的塔楼俯视着那个村庄。
- He saw the tower in relief against the sky. 他看到那塔耸立在空中,轮廓十分鲜明。
- The top of the castle tower has been shot off. 城堡塔楼的顶部已被炸掉了。
- The steam tug takes canal boats and barges in tow. 驳船后面拖着小艇和平底船。
- How does that tall tower stop up? 那座高塔是怎样竖着不倒的?
- The tower was visible from afar. 从远处就能望到那座塔。
- Have you seen the hill whereon a tower is standing? 你看到耸立着一座塔的那座小山了吗?
- The tower rises steeply from the flat ground. 那座塔陡峭地自平地耸起。
- Keywords job hazard analysis;light hydrocarbon station;desulfur tower packing changing; 工作危害分析;轻烃站;脱硫塔填料更换;
- Has the tower been topped off yet? 塔楼举行封顶仪式了吗?
- The tower stood amidst the ruins. 塔矗立在废墟中。
- He pointed to a tower on the distant horizon. 他指向远处地平线上的一座塔。
- Corrosion and Protection of Desulfurizing Tower 气体脱硫塔的腐蚀与防护