您要查找的是不是:
- deformation of crane beam 吊车梁变形
- Excavation of crane beam at rockwall 岩壁梁部位开挖
- Preliminary Probe into the Design of Crane Beam for Rock Anchor 岩锚吊车梁设计方法初探
- Never lift up load beyond rated capacity of crane. 绝对不可提升超过吊臂所能承受的荷载的物件。
- Application of Submerged-arc Welding in The Manufacture of Crane Beam 垫板法埋弧焊在天车梁制作中的应用
- She appeared to deformation of the face. 她出现了能变形的面孔。
- THE SUPPORTING LENGTH CALCULATION OF WHEEL PRESSURE LOAD OF CRANE BEAM 吊车梁的轮压荷载支承长度计算
- Design of Crane Moment Limiter by Sing. 单片机力矩限制器的研制。
- Lift the load by means of crane. 用起重机将重物吊起。
- Never !ift up !oad beyond rated capacity of crane. 绝对不可提升超过吊臂所能承受的荷载的物件。
- Brush frame is a kind of crane accessories. 碳刷架是起重机的一种配件。
- Screw shield is a kind of crane accessories. 丝杠防护罩是起重机的一种配件。
- Look! The thing is conductors of crane. 瞧,这是用于起重机上的导体。
- Deformation of a spring is linear with the force applied on it. 弹簧的变形量与施加在其上的作用力成线性关系。
- Deformation of the main beam of the bridge crane is one of primary breakdown.The pre-stressed method not only restores the main beam of the bridge crane , but alos improves its load-bearing capacity . 桥式起重机主梁的下挠变形是桥式起重机的主要故障之一,采用预应力张拉工艺修复,不仅能使主梁下挠得以恢复,而且可以使主梁的承载能力得到提高。
- Optimization of Blasting Parameters of Crane Beam at Rockwall in the Underground Workshop 某水电站地下厂房岩壁梁爆破参数优化研究
- MEASURED VARIABLE-AMPLITICED FATIGUE DATA AND VIBRATION MODAL ANALYSIS OF CRANE BEAM 实测吊车梁变幅疲劳数据及振动模态分析
- Mechanical analysis and design of crane beam on rock wall for underground power house 地下厂房岩壁吊车梁的力学分析及设计
- Sketch the deformation of the frame corresponding to each. 画出每一种情况下的钢架变形草图。
- Responsibilities: Be responsible for electrical design of crane. 负责起重机的电气设计及技术支持。