您要查找的是不是:
- cut section rail circuit 分割区段轨道电路
- PASTE the cut section back in (Cntrl+V). 继续检查看看,问题是不是解决了,或者问题是不是除掉了。
- The cut section of the hyperinflated lung of a patient dying in status asthmaticus appears essentially normal. 死于哮喘持续状态病人的肺切面基本正常。
- Seen in the pulmonary artery to the left lung on cut section is a large pulmonary thromboembolus. 左肺肺动脉内大血栓。
- Here is a cut section of a kidney with recessive polycystic kidney disease (RPKD). 隐性遗传性多囊肾的切面。
- Some Ideas on Solving the Badness of Rail Circuit Distribution Section 解决分路不良轨道电路区段的几点设想
- The sacrospinalis muscle and three anterolateral flank muscle layers are seen in cut section, and the three layers of the lumbodorsal fascia posteriorly can be appreciated. 在切口断面可以看到荐棘肌和前外侧横腹肌层,从后部还可以看到腰背筋膜的三层组织。
- Analysis and research on electricity voltage simulation quantity in rail circuit section 轨道区段电压模拟量的分析研究
- Analysis of Deformation of Complex Section Rail by CAE 复杂截面导轨变形的计算机辅助分析
- The pattern of woody increments can be readily observed on stumps and on the ends of cut sections of tree stems. 在伐根上和在树干截面上,可以迅速观察出木材生长量的形状。
- Rose bushes shoot again after being cut back. 玫瑰丛修剪後还能再长出新枝。
- In order not to be late, she cut across the fields. 为了不迟到,她抄近路穿过田野。
- Rise and Fall Roller Design for Heavy Section Rail Process Line 大型重轨加工线升降辊道设计
- In order to monitor and control cutting section automatically,the boom-type roadheader was simplified as roboticized model. 为实现对悬臂式掘进机的截割断面实时监测和自动控制,对其机器人化模型进行简化。
- Maintain Rail Circuit in Good Condition, Ensure Train Operation Safety 维护轨道电路良好状态保证列车安全运行
- He cut off a bunch of grapes to entertain us. 他剪下一串葡萄招待我们。
- When the excavator is working, the drilling machine can withdraw from backplate of cutting section to the back of the excavator, thus it greatly saves the space of drilling. 掘进机工作时,钻探机构可以后退收缩,从截割部护板退回到掘进机本体后部,最大程度地降低钻探机构的空间尺寸。
- Research on renovating technology for badness of rail circuit distribution 轨道电路分路不良整治技术的研究
- When the excavator is working, the roofproof machine can withdraw from backplate of cutting section to the back of the excavator, thus it greatly saves the space of roof proof. 掘进机工作时,护顶机构可以收缩折叠,从截割部护板退回到掘进机本体后部,最大程度地降低护顶机构的空间尺寸。
- She reckoned she had cut her cost by half. 她估计她减少了一半的费用。