您要查找的是不是:
- Concrete and pitch filled core wall construction in Fudiyingzi Reservoir dam 富地营子水库大坝沥青混凝土心墙施工
- Core wall construction management for the auxiliary dam of the Fengcheng Upper Reservoir 风城高库北副坝心墙施工控制
- The problems such as design of rockfill dam with high core wall, the stability of surrounding rocks and the design of spillway are the key to the project construction. 该工程高心墙堆石坝设计、地下厂房围岩稳定、溢洪道设计等问题是工程建设的关键问题。
- The core wall of asphalt concrete with placement was applied to low clam. 浇筑式沥青混凝土心墙多用于低坝,易于施工。
- Clay core wall rockfill dam is one of the most widely used dam type.However, because it is scarcely seen in pumped storage power plant at home, there is little construction experience for reference. 摘要粘土心墙堆石坝是应用最为广泛的坝型,但用于抽水蓄能电站的挡水坝在国内较少见,实践经验并不多。
- Even a triple glazed unit has 10 times the heat loss of a standard ZED wall construction. 环境效益即使只是一个三层玻璃单元,热损却是标准零能耗建筑墙结构的10倍。
- The maximum dam height of the rockfill dam with core wall for the Nuozhadu Hydropower Station is 261.5 m. 糯扎渡工程心墙堆石坝最大坝高261.;5m。
- The achieved results show that dispersive soil can be served as the clay core wall in earth dam under filter layers. 在做好反滤层设计的前提下,用分散性土样作为防渗心墙的填筑土样是可行的。
- Behind sitting mechanism of directional topping of frame,framed bent and framed shear wall construction demolished by blasting is studied. 研究了框架、排架和框剪结构爆破拆除定向倾倒时后坐的机理。
- The TSR Element has a thin wall construction and a clear inner diameter which makes it useful for tube furnace applications. TSR有一层薄壁结构和非常空旷的内径,这个更有助于炉壁内的应用。
- This paper analyzed the inner force of the frame-concrete core wall structure with outrigger under the action of wind loading by ETABS. 摘要本文对带一个水平加强层的超高层框筒结构进行了风荷载作用下的三维有限元分析。
- The construction of the Zhong-tain Square Project s standard storey s exterior beams,and exterior columns and core walls have been done by climbing form work. 中天广场标准层外梁、外柱和核心筒墙体采用爬模,标准层楼面采用飞模。
- Shandong Province is located in the seismic belt with numerous reservoirs, most of whichare core wall type sanded shell dams. 山东省属多地震区,水库众多,且多为心墙砂壳坝。
- But for the ordinary people, although free to partition, but also because of the wall construction, the old and new, if not contact the wall will crack. 但对老百姓而言,虽然可以自由分割,但由于需要进行墙体构造,如果新旧墙体接触不好,就会开裂。
- ZLP series suspended power platform have been widely used in the refurbishing of outer wall construction、installing of curtain wall 、maintaining cleaning of mansions. ZLP系列电动吊篮已在高层建筑物的外墙涂饰、幕墙的安装以及维修清洗得到广泛应用;
- The effect on seepage is small when the opening of cutoff wall crack is less than 0.3cm,themaximum relative water head at the bottom of lower core wall is only 2.02%. 防渗墙出现裂缝开度小于0.;3cm时;对渗流场的影响不大;防渗墙下游心墙底部最大相对水头值仅为2
- To add aesthetic, it was generally used in furniture, pipes buried wall construction, but if the leakage and burst, will bring irreparable consequences. 为使居室美观,人们在装潢时水管一般都采用埋墙式施工,不过,一旦出现水管渗漏和爆裂,将带来难以弥补的后果。
- This paper presents the restraining moments acting on the core wall due to outriggers and the equation of the top horizontal displacement based on a simplified outrigger model. 根据伸臂结构的简化模型和伸臂与外框柱的变形协调条件,考虑伸臂的实际刚度,导出伸臂对核心墙的附加力矩,求得结构顶点侧移。
- In designing the earth rock dam with clay core wall, the exit height of side phreatic line at the downstream of core wall is of great importance to the designers. 在粘土心墙土石坝设计中,心墙下游侧浸润线的逸出高度对设计人员来说是十分重要的,它不仅是计算心墙稳定性的重要因素,也是决定心墙下游反滤层设施高度的重要参数。
- Based on a certain high-rise apartment building in Pingdingshan City,the pure concrete wall construction techniques is described in the aspects of construction survey,shuttering works,concrete works and concrete deficit modification. 结合平顶山市某高层住宅楼工程实际 ,从施工测量、模板工程、混凝土工程及混凝土缺陷修补等方面 ,较详细地阐述了清水混凝土的施工工艺