您要查找的是不是:
- construction cost estimate 建筑成本预算,工程费用预算
- What is included in a Landed Cost estimate? Landed Cost预算包括甚么内容?
- Assist PM for improving reliability of project cost estimate. 负责项目的成本分析和成本控制.
- Position and Action of Licensed Construction Cost Estimator in Construction Management 注册造价师在施工监理中的定位及作用
- For the contractor ,a bid estimate submitted to the owner either for competitive bidding or negotiation consists of direct construction cost including field supervision ,plus a markup to cover general overhead and profits. 建筑成本估算要求的精确程度在项目发展的不同阶段发生着变化,从早期的相近数字到施工前预算控制时相当准确的是数字。
- How can I calculate my shipping charges for use in the Landed Cost estimate? 我怎样计算我的托运费用,以便用于Landed Cost预算?
- Receive an immediate cost estimate for your shipment before shipping. 您可以在寄件前取得即时的预估费用。
- Cost estimate of the expense portion, i. e. the equipment and materials. 费用部分,即设备和原料的成本估计。
- For the contractor , a bid estimate submitted to the owner either for competitive bidding or negotiation consists of direct construction cost including field supervision , plus a markup to cover general overhead and profits. ?建筑成本估算要求的精确程度在项目发展的不同阶段发生着变化,从早期的相近数字到施工前预算控制时相当准确的是数字。
- Parametric and bottom-up cost estimation. 参数及自下而上成本估算法。
- construction cost estimation 工程估价
- Costs Estimate For Trade Marks Application in the FRANCE. 法国商标注册申请费用。
- To prepare all of financial statement relevant to construction cost and investment. 编报有关基建投资成本等各类报表。
- System construction cost low, the maintenance cost are few, but largely reduces the project cost. 系统造价低,维护费用少,可大幅降低工程成本。
- Our Landed Cost engine provides you with a cost estimate of international shipments. 我们的Landed Cost引擎将为您提供国际货件的成本估算。
- Flexibility: At the same time of saving construction cost, MRL and SMR elevators provide designers more free space. 体积小的交流无齿轮曳引机,使无机房或小机房电梯的布置成为可能,在节省建筑成本的同时,提供给设计师更多的自由空间。
- Be responsible for cost estimate, planning, contract management and resource allocation. 负责成本控制,项目计划,合同管理及人员分配。
- Qualification Certificate on Project Construction Cost Consultation awarded by the Ministry of Construction of China. 中华人民共和国建设部颁发的工程造价咨询甲级资质证书。
- Third, a cost estimate for the project was needed covering both the building and future running of the system. 第三,需要对系统的建设和今后的运行进行一次项目费用概算。
- Your Landed Cost estimate and actual shipment charges may vary for several reasons. 您的Landed Cost预算和实际托运费用不符可能有若干原因。