- The main causes of breakage were concrete tube pile instability of foundation pit or failure of its bracing, soil squeeze due to pile driving, incorrect excavation and incorrect heap of soil. 摘要造成混凝土管桩倾斜与断裂的主要原因为基坑边坡失稳或支护结构破坏、沉桩挤土效应以及挖土与堆土不当等。
- the pre-stress concrete tube pile 预应力混凝土管桩
- pre-stress high strength concrete tube pile 预应力高强混凝土管桩
- static pressure prestress precast concrete tube pile 静压预应力混凝土预制管桩
- Application of Prestressed Concrete Tube Pile for Soft Soil Ground Reinforcement in Railway 预应力混凝土管桩在铁路软基加固中的应用
- Treatment of Horizontal Deviation of Prestressed High-strength Concrete Tube Pile 预应力高强度混凝土管桩偏位的处理
- Analysis on spiral reinforcement mechanics of high prestress performance concrete tube pile 预应力高性能混凝土管桩螺旋箍筋受力研究
- VIBRATION TESTING TECHNIQUE FOR SUPER HIGH STRENGTH PRESTRESSED CONCRETE TUBE PILE 超高强预应力混凝土管桩桩基振动检测技术
- prestressed concrete tube pile 预应力混凝土薄壁管桩
- concrete tube pile 混凝土管桩
- pre-stress concrete tube pile 预应力混凝土管桩
- Rubber bush for prestressed concrete tubing. 说明:制造预应力水泥管时使用的橡胶模套,。
- HeLong Trestle was constructed by steel tube pile bracket after comparing some schemes. 和龙高架桥现浇箱梁经过方案比较选用钢管桩支架施工。
- Due to the limitation of theory investigation for the PHC Tube Pile by Augering on Tip in days gone by, and. 抱压式桩端自引孔静压入岩工艺使用PHC管桩的应用得到进一步发展,根据区域性地质条件特点,在江西地区已经开始逐步推广使用。
- The symbol tower of Haier Group in Qingdao is composed of concrete tube structure of which height is 50m and 80 degree triangular pyramid steel structure of which height is 100m. 青岛海尔“时空飞碟”项目由高50m的观光塔筒体结构和高100m同时前倾80°的斜三棱锥体钢结构标志塔组成。
- Based on the deep excavation project of high-building in Nanchang,support methods with new anchorage pipe and steel tube pile are introduced including schematic design and construction technology. 以南昌某时代广场深基坑支护工程为背景,从方案设计、施工工艺方面介绍新型锚管加钢管桩支护方式,该支护方式具有安全经济特点。
- To facilitate tube jacking operation, the jacking part will use reinforced concrete tubes with F-type interface. 为便于顶管作业,顶管部分采用F型接口钢筋混凝土管。
- The design and construction of prestress tube pile 预应力管桩的设计与施工