您要查找的是不是:
- This paper mainly introduce the technical innovation of lowering the temperature of the basement of coke furnace of JISC by ventilating. 介绍了酒钢焦化厂焦炉地下室通风降温技术改造成果。
- The experience to use pure blast furnace gas in coke furnace firing and toasting in Chengde Coking and Gas Co. 介绍了承德焦化煤气股份有限公司在焦炉点火烘炉中使用纯高炉煤气的经验。
- The experience to use pure blast furnace gas in coke furnace firing and toasting in Chengde Coking and Gas Co.Ltd.is introduced. 介绍了承德焦化煤气股份有限公司在焦炉点火烘炉中使用纯高炉煤气的经验。
- Capacity expansion of delayed coke furnace 焦化加热炉扩能改造
- In Taiyuan, soot poured from coal mines, coke furnaces and other major factories, as well as from apartment building boilers and kitchen stoves. 在太原,煤灰从煤矿、焦炭炉、大型工厂、锅炉、炉灶中大量排出。
- Two controllers were designed,one was coking furnace controller,the other was main fracionation system controller. 设计两个先进控制器,分别是焦化加热炉控制器和主分馏系统控制器。
- Two controllers were designed, one was coking furnace controller, the other was main fracionation system controller. 设计两个先进控制器,分别是焦化加热炉控制器和主分馏系统控制器。
- The protection measures to high temperature adopting in production of coking furnace are introduced. 介绍承钢焦化厂在实际生产中对焦炉设备高温防护采取的措施。
- Directory Digital Control is introduced in the article, and Coking Furnace Intelligent Control System is designed and realized according to DDC. 计算机控制系统的控制水平也已经大大提高。 本文比较详细的介绍了一种直接数字控制系统的计算机控制方案,并应用此控制方案设计并实现了东郊煤气厂的焦化炉压力控制系统。
- Advanced Control System Development for the Delayed Coke Furnace 焦化加热炉先进控制系统
- The whole geometric structures of combustor,combustion chamber and furnace tube in delayed coking furnace were accurately calculated by the whole-coupling method. 采用分区耦合的计算方法,实现了对工业焦化炉从燃烧器、炉膛、炉管整体几何结构的仿真,并且对焦化炉内流动、燃烧和传热全部工艺过程进行了模拟。
- Such as: coking furnace, iron, water, steel converter, pouring ladle, tundish, ladle covered, boilers, electric furnace and heat treatment furnace, and so on. 如:焦化炉、铁水罐、炼钢转炉、浇注钢包、中间包、钢包盖、锅炉、电炉及热处理炉等。
- I bought a cup of coke and some popcorn. 我买一杯可口可乐和一些爆米花。
- First, ore is mixed with coke and limestone. 先把铁矿石和焦碳、石灰石混合在一起。
- Large Copper Alloy Parts in Low Pressure Casting with Coke Furnace 用焦炭炉低压铸造大型铜合金铸件的工艺研究
- Welding deformation control of gas collecting pipe of coke furnace 焦炉集气管焊接变形的控制
- The fire( furnace) has burnt itself out. 炉火因燃料烧尽而熄灭了。
- Revamping the Backward Devices, Ensuring No Smoke from Coke Furnace 改造落后设备,确保焦炉无烟
- The refuse left when coke or charcoal is made. 焦炭渣,煤屑焦炭或木炭做成后剩下的渣滓
- A corrosion perforation on water injection pipeline of the coking furnace convection room caused coking unit short time shut down,and brought a serious influence on long term operation. 中国石化福建炼油化工有限公司焦化炉对流室上部注水管腐蚀后穿孔泄漏,造成装置临时停车,严重影响装置的长周期运行。