您要查找的是不是:
- "Over the last part-section of the Base from the location of the tunnel placing Boom, the delivery line is guided by means of a shiftable pipe Bridge. 距隧道布料机基底的最后一段,输送管采用可移动的管道桥。
- Big cement kiln above all front and hind nozzle, burner coal pipe etc in hightemp and wearresistant parts and kiln liner. 大型水泥窑前后窑口、喷煤管等高温耐磨部位及其它工业炉窑内衬。
- Suspension pipe bridge is a kind of common structural form consisted mainly of main cable, wind cable, tower foundation, anchor system and girder form pipe bridge. 摘要县索式管桥是长输管道跨越中常用的一种形式,其结构主要由主索、抗风索、塔基和锚固系统及梁式管桥等部分组成。
- Based on analysis design and theoretical study of the available basket-like semi-crossing pipe bridge (BSPB), an unsymmetrical fuzzy optimum model of BSPB is set up in this paper. 本文在现有关于提篮半穿式管桥分析设计和理论研究的基础上,建立了非对称模糊优化模型,所给算例表明,采用模糊优化设计方法得到的设计方案在技术上更可靠,经济上更合理。
- Discussion on Selection Line for Convey Coal Pipe 浅谈长距离输煤管道线路选线
- Application of Reinforced Concrete Pipe Bridge 钢筋砼预制管临时桥的应用
- Lifting of arch rib for pipe bridge 管桥肋拱的吊装施工
- Application of "Free Branch Form" Mining Method in Coal Pipe "树枝状"采煤法在极薄煤层开采中的应用
- We need to replenish our stocks of coal. 我们需要再次补充煤的储备。
- She piled on more coal before the fire go out. 在火熄灭之前她又加上些煤。
- Design of lower pipe bridge in Tengzigou water power station 藤子沟水电站下管桥设计
- I add the coal on the flame continuously. 我不断朝火里添加煤炭。
- They are ventilating the sap of a coal mine. 他们正在使煤矿坑道通风。
- Prohibition was laid on the export of coal. 禁止煤炭输出。
- Design on Structure of the Suspension Cable Pipe Bridge 悬索管桥的构造设计
- Dynamic characteristics of cable stayed pipe bridge in pigging 大中型斜拉索管桥清管动力特性分析
- He put a shovel of coal on to the fire. 他往火炉里加了一铲煤。
- That coal mine is no longer worked. 那个煤矿已经不经营了。
- We have enough coal to see the winter out. 我们有足够的煤过冬。
- Pipe Bridge Design of Power Plant Flue Gas Desulfurization Project 发电厂烟气脱硫综合管架设计