您要查找的是不是:
- integrated action of pile and soil 桩土共同作用
- Building Sluices on Soft and Clay Bed through Natural Foundation or the Combination Action of Pile and Soil 软粘土地基采用天然地基或桩土共同作用建水闸
- The adjustment function of cushion from its thickness and modulus on the stress of pile and soil was studied. 褥垫层对桩土应力的调节作用,复合地基的应力随褥垫层的模量和褥垫层的厚度变化规律。
- The characteristics of co-operation of pile and soil, reinforce mechanism, failure mode and engineering characteristics of rammer carrier CFG pile composite foundation are also researched. 研究夯扩载体CFG桩复合地基的桩土共同作用特性、加固机理、破坏模式和工程性质。
- average velocity of Rayleigh wave of pile and soil 桩土平均瑞利波速
- the interaction of pile and soil 桩土相互作用
- A method to design and optimize on this composite foundation is provided, include of the size of cap on the top of pile, how to calculate the load on piles and soil, and the concise method with two step for calculating settlement. 并提出PTC疏桩复合地基的优化设计思路,桩帽的设计方法,桩、土分担荷载的计算方法,以及沉降计算中简单适用的分部计算法和拟应力修正法。
- Through in-situ tests on multi-pile composite subgrade, the authors analyzed stress-ratio, bearing ratio and bearing capacity factors of piles and soil in multi-pile composite subgrade, and made some suggestions to project designer. 摘要通过一个具体工程的试验研究,分析了多桩型复合地基桩土应力比、荷载分担比、桩与土承载力发挥等桩土承载性状,并据此提出了若干建议性的结论,供工程设计参考。
- According to the technical characteristics of preloading piles, by analyzing the mechanism of interaction of piles and soil, the mechanism of rebound of piles in the course of underpinning was gained. 摘要根据预压桩托换法的工艺特点,通过桩-土相互作用的工作原理分析,得出预压桩托换中桩体回弹的工作机理。
- Seemingly as two paralleled track, the relationship and interactivities of IAE and EAE has been existing for more than 50 years, the co action of which has formed an unique mode for the juvenile art education. 校内外美术教育看似两条平行的轨道,但在50多年的发展历程中,其实存在着诸多联系和互动,并因此形成了我国青少年美术教育的独特教育模式。
- reaction force of piles and soil 桩土反力
- Mechanical Behavior Analysis of Composite Pile Foundation Considering Bearing Strength of Pile and Soil 考虑桩与地基土共同承载的复合桩基受力性能分析
- Analysis on Internal Force of Pile Foundation with Finite-Boundary Element Method Considering the Interaction of Pile and Soil 桩土共同工作的桩基内力分析有限-边界元法
- The action of the strikers was unjustified. 罢工者的行为是不合理的。
- The green book is at the bottom of the pile and the red one is on top. 绿皮书在那一堆书的底下,红皮书在上边。
- The action of salt on ice causes it to melt. 盐作用於冰而使其融化。
- Non-stop action of the hot and sweaty kind! 火辣的,流汗的那种不停的运动!
- The slow movement of rock debris and soil down a weathered slope. 蠕动岩石碎片和土壤沿着受风雨侵蚀的滑坡向下缓慢移动
- Blinking is a mechanical action of the eyelids. 眨眼是眼睑的无意识动作。
- In this paper, the finite element method is used for the analysis and computation of interaction between pile and soil in super-highrise frame-tube. 本文采用有限元法分析计算了超高层筒中筒结构桩土的共同工作。