您要查找的是不是:
- change of construction project 施工变更
- To have the knowledge of construction investment plan, construction project estimates and construction contracts. 掌握工程投资计划、工程概算资料及各类工程合同。
- Research on the Dynamic Schedule Optimization of Construction Project on the Condition of Minimum Cost/Maximum Benefit. 费用最低/收益最大条件下的工程项目动态进度优化研究
- A description of construction project scheduling problem with flow processes is given. 首先给出了带流水作业工程项目调度问题的描述;
- The duty of supervising unit in engineering construction is to supervise the work of construction project. 工程建设监理是对工程建设项目建设所实施的监督管理活动。
- Be responsible for budget control of construction projects. 负责工程项目的预算控制。
- Take a change of clothes with you. 把你替换的衣服带去吧。
- The problems existed in the prior period of construction project,such as laggard work and imperfect scheme,are pointed out in this paper. 指出了在建设项目前期工作中存在的问题 ,建设项目前期工作滞后 ,前期方案深度不够。
- Thereforth,the change of construction blood vessel is closely related with matrix metalloproteinases. 因此,基质金属蛋白酶与血管结构的改变密切相关。
- To comply with the rules and procedure of construction project settlement in order to ensure the settlement payment accurate and timely. 认真执行工程结算有关规定,严格履行工程结算手续,保证结算付款准确及时。
- A change of diet may do you good. 改变一下饮食对你可能有好处。
- That is : owners are client. So , owner is the primary factor on the manage of construction project and the engineering quality. “有什么样的业主,就有什么样的项目管理,也就有什么样的工程质量。”
- A good pitcher has a change of pace. 一个好投手能投出速度捉摸不定的球。
- Numerous environmental dissension and pollution accident can be avoided radically by means of An succeed assessment of construction project. 房地产建设项目环境影响评价可以从源头控制和预防可能发生的环境污染和环境纠纷。
- The doctor urged a change of air. 医生力劝换个环境。
- Assurance science, reasonable of construction project and construction the craft be a technique system of importance contents. 确定科学、合理的施工方案与施工工艺是技术系统的重要内容。
- We use factor analysis method to evaluate partner building safety in the setting of virtual enterprise of construction project. 摘要应用因子分析法对建设项目动态联盟背景下的伙伴施工安全进行评价。
- Circumstances have compelled a change of plan. 因情况所迫,计划已经改变。
- Please notify us of any change of address. 地址如有变动,请通知我们。
- The key to effective control and management of construction project cost lies in ability to measure and analyze accurately the cost factors influenced. 施工项目成本的有效控制与管理,关键在于能对成本影响因素进行准确的计量与分析。