您要查找的是不是:
- cast- in- place floor slab 现浇楼板
- The floor slab must be reinforced to sustain this heavy equipment. 必须增加楼板的厚度,确保能承受这些沉重的仪器。
- False ceilings are avoided so that floor slab thermal mass can be exposed in order to dampen temperature fluctuations. 人工天花被取消了,因此水泥楼板的热量聚集暴露于外,用来抑制温度的波动。
- cast - in - plate reinforced concrete floor slab 现浇混凝土楼板
- Our company specialise in providing high quality wall and floor slab formwork systems. 我司专业提供优质墙面和地板楼板模板系统。
- The floor slab adopt EVE light-weight composite floor panel with a layer of cast-in-place concrete . 楼面采用EVE轻质复合楼层板及现浇薄层轻质砼层进行叠合。
- The periphery of common balcony, it is the baluster structure that makes with floor slab, relying on indoor a side is brick wall. 普通阳台的外围,都是用水泥板制成的栏杆结构,靠室内一侧则是砖墙。
- Simple early form-removal system of floor slab structure is put forward considering the defects of traditional formwork. 结合楼板结构常规模板存在的缺陷,提出了简易早拆模板体系。
- Both the rigid floor slab and the deforming floor slab are taken into account in the structural analysis to verify the rigid floor slab assumption. 为确证楼板平面内无限刚的分析假定,进一步分析比较了在无限刚度及实际楼板变形下,对抗侧体系内力分配的影响。
- An access court has been cut out of the existing 1st floor slab marking the entrance and bringing daylight in to the ground floor foyer. 入口庭院穿过架空层,直接和二层楼板交接形成坡道通向二层,这个入口既作为学院的主入口,同时又为首层的门厅提供了日照。
- He is cast in his father's mold. 他长得和他父亲一模一样。
- Causation And Prevention Of Cast - In - Place Floor Crack 现浇板裂缝产生的原因与防治
- This paper analyses causations of precast floor slab crack in engineering from the aspects of design, material and construction. 本文从设计、材料、施工三方面 ,详细分析了工程中预制楼板板缝开裂的原因。
- The earthwork was cast up in three hours. 土方工程在三小时内就完成了。
- Place your right toe in line with your left heel. 把右脚趾与左脚跟排在一直线上。
- By reinforcing the composite concrete floor slab with structural steel plates, Arup optimized the structural system to meet the building's complex requirements. 为了满足建筑复杂的要求,阿拉普通过使用钢板加强组合楼板优化了结构体系。
- She earned her place in the team by training hard. 她由于刻苦训练而在队里取得了地位。
- He cast his last remark in more formal wording. 他用更正式的措词表达了最后一句话。
- An electrician was assigned to bore holes on each floor slab of a building, with the use of a concrete coring machine, in order to install conduits for wiring work. 混凝土钻孔机乃楼宇石屎层钻孔的电工技术,以便工人可在钻孔装置管道进行配线工序。
- I came in seventeenth place in the games. 我获得了那项比赛的第十七名。