您要查找的是不是:
- buried steel pile 内埋型钢柱
- Repairing technical requirement for steel pile col. 绞吸式挖泥船钢桩卡箍修理技术要求。
- Repairing technical requirement for steel pile of. 绞吸式挖泥船钢桩修理技术要求。
- The protective coating of buried steel pipelines plays a main role in anticorrosion. 摘要外覆盖层在埋地钢质管道的防护中起着主要作用。
- Mainly used in coating the weld joint of buried steel pipeline and insulated pipeline. 主要用于埋地钢质管道现场焊接补口和保温管线现场补口;
- Construction layer top will use scaffolding steel pile to pull in and out side scaffolding. 3施工层顶端用脚手架钢管拉结内外脚手架。
- The external wall of buried steel pipeline used for the transmission of urban gas will be corroded chemically and electrochemically because of the reasons of the soil. 用于输送城市煤气的埋地钢管道的外壁会因土壤的原因产生化学腐蚀和电化学腐蚀。
- Your letter got buried under a pile of papers. 你的信压在一堆文件下面了。
- They found the body buried beneath a pile of leaves. 他们在一堆树叶下面发现了那具尸体。
- In Fig. 16 details are given of the propping arrangement with central rows of driven steel piles, as used during the excavation for a four-track underground station in Hamburg. 图16所示为开挖建设汉堡地下四车道车站时使用的支撑系统,采用了中间打入数排钢桩的设计。
- He was sitting with his head buried in a book. 他坐着埋头看书。
- Taking one of wharf's as an example,a practical solution to renovation of wharf's steel pilings anti-corrosion system is proposed which is proved effective in practice. 以某码头钢管桩防腐蚀体系二次修复工程为实例,总结出一套切实可行的技术方案及施工方法,解决了滨海码头钢管桩防腐体系二次修复的难题。
- On plains where the ground is largely glacial till, such as in North Dakota, steel pilings to anchor footings may have to be driven 100 feet into the ground. 在美国北达科塔州等地面大多是冰碛的平原上,固定底座的钢铁桩基往往必须深入地面30公尺。
- The lorry was destroyed by a buried mine. 卡车被一枚埋在地下的地雷炸毁。
- Application of Stray Current Mapper to Buried Steel Pipeline 杂散电流测绘仪在埋地钢质管道杂散电流检测中的应用
- Corrosion Mechanism of External Coating of Buried Steel Pipeline 埋地钢质管道外防腐层的腐蚀机理
- Those dead soldiers were buried in the tombs. 那些死去的战士被埋葬在坟墓里。
- Both his grandparents were buried here. 他的祖父母都葬在这里。
- He walked slowly, his hands buried in his pockets. 他走得很慢,两手插在衣袋里。
- Detecting Steel Pile by PDA Dynamic Trail-Pile Method 用PDA高应变动力试桩法检测钢桩