您要查找的是不是:
- Installation of runner and runner chamber of bulb turbine unit and its gap adjustment 灯泡贯流式水轮发电机组转轮与转轮室的安装及间隙的调整
- bulb turbine units 贯流式机组
- The frame of bulb turbine hydropower station plants are complex 3D frame to provide powerful gist for the struc. 灯泡贯流式水电站就有着工程量小、建设周期短、淹没损失少、便于集资等优点,因此越来越受到人们的关注。
- Optimization Model of Life-time Management for large Steam Turbine Units. 大型汽轮机组的优化寿命管理模式。
- This paper carries on the3 D finite element structure analysis for power house monolith with a bulb turbine hydropower station located in the upstream of Huang River as the carrier. 以黄河上游拟建的某灯泡贯流式水电站为载体,对厂房坝段整体进行了三维有限元结构分析。
- At Shengli Gubei Thermoelectricity Plant, the gas turbine unit has been unused due to natural gas shortage. 摘要胜利石油管理局电力管理总公司孤北热电厂,担负着黄河以北油田工业生产、居民生活的部分用电负荷的发供电任务。
- Caoqiao Gas-fired Cogeneration Plant, Taiyanggong Gas-fired Cogeneration Plant, and gas turbine units of the Third Cogeneration Plant (phase I and II) will be constructed. 建设草桥燃气热电厂、太阳宫燃气热电厂、第三热电厂燃气发电机组一期和二期工程。
- This paper carries on the 3D finite element structure analysis for power house monolith with a bulb turbine hydropower station located in the upstream of Huang River as the carrier. 摘要以黄河上游拟建的某灯泡贯流式水电站为载体,对厂房坝段整体进行了三维有限元结构分析。
- Demolish and remove all plant equipment and associated facilities of the two gas turbine units TG1 and TG2 inside Tsing Yi Power Station. 清拆及运走位于青衣发电厂的一号及二号涡轮机组的所有设施及有关设施。
- Demolish and remove all plant equipment and associated structures of the gas turbine units GT3, GT4, GT5 and GT6 inside Castle Peak Power Station. 清拆及运走位于新界屯门青山发电厂的三号、号、号及至六号涡轮机组的所有设施及有关结构。
- On Isolated Network Operation of Bulb Turbine Generating Unit 灯泡贯流机组孤网运行
- The technique and control system of the Top Pressure Recovery Turbine Unit (TRT) system are introduced. 介绍了高炉炉顶余压透平发电装置(TRT)的工艺流程和控制系统配置。
- Caoqiao Gas-fired Cogeneration Plant,Taiyanggong Gas-fired Cogeneration Plant,and gas turbine units of the Third Cogeneration Plant (phase I and II) will be constructed. 建设草桥燃气热电厂、太阳宫燃气热电厂、第三热电厂燃气发电机组一期和二期工程。
- Hydraulic Loss Analysis in Bulb Turbine 灯泡贯流式水轮机水力损失分析
- In this disquisition,on the basis of the analysis of the structure characteristic of Lp rotor and bearing system of domestic 300MW turbine units,the characteristic of No. 在对国产300MW汽轮机低压转子与轴承系统的结构特点分析基础上,结合大量现场试验研究,分析了300MW汽轮机4号轴承不稳定振动的特点。
- Field Test Results of 10MW Bulb Turbine 10MW灯泡贯流式水轮机的现场试验
- DEH is used to control the turbine unit widely and it can complete the function of start up,acceleration,breaker,load control and so on. 数字电液控制系统(DEH)广泛应用于汽轮机的控制,它完成对汽轮发电机的启动、升速、并网、带负荷、保护等控制。
- The composition and features of governer system without controlled working medium, as well as its successful application on200 MW steam turbine unit, have been presented. 介绍了无控制工质调节系统的组成、点以及在200mw汽轮机组上的成功应用。
- After putting CN6-35/9 steam turbine unit of Nanjing Chemical Industry Co into operation, serious vibration of the servomotor and oil-pipe in the governing system had occurred. 摘要南京化学工业公司CN6-35/9汽轮机组投运后,调节系统油动机及管道严重振动。
- The paper describes the development idea and process of EH oil regeneration device for large turbine unit,analyzesits practical,economical and social value. 阐述了大型汽轮机组EH油再生装置开发研究的思路、过程,分析了成果的实用性及经济价值、社会价值。