您要查找的是不是:
- broken line type face slab 折线型面板
- straight line type face slab 直线型而板
- The broken line type roof truss of prestress and constructs quality control main point 后张法预应力折线型屋架制作施工质量控制要点
- The broken line shows the interest rate. 断线表示利率。
- You can't mistake the broken line of that bridge house. 凭那桥室曲折的轮廓,准错不了。
- The machine adopts the design of two-plate type strap, which can pre-fole the first broken line 180 and the third broken line 135 and the extend them. 依盒型采用二板式皮带设计,可作第一折线180与第三折线135的预折并展开。
- The face slab rockfill dam of Shuibuya Hydropwer Station is the highest one being built in the world at present. 水布垭水电站混凝土面板堆石坝,属目前在建的世界第一高面板堆石坝。
- Bold: Typographic term for a heavier than standard weight of a type face. 黑体:印刷字体学的名词,指笔划较标准的字体为粗的字体。
- The crushing side wall is used the upstream consolidation slope measures of rockfill dam with concrete face slab. 混凝土面板堆石坝采用挤压边墙作为大坝上游固坡措施。
- Remarks: The parts between the broken line can be assembly together randomly. 说明:虚线之间的零件可以互相自由组合。
- I'm not breaking line of sight with you. 否则我不会让你离开我的视线。
- With the development of concrete face slab dam, the upstream slope construction is a key factor affecting the schedule and quality of construction. 在混凝土面板坝的发展过程中,上游坡面的施工始终是一个控制进度和影响质量的关键环节。
- Broke line missing to outline these stave hugs. 断了线的思念勾画出那些破碎的拥抱。
- General speaking,the design of face slab includes plinth,face slab,perimeter joints,vertical joints and horizontal joints. 面板作为面板堆石坝的挡水结构,在面板堆石坝设计中占有重要地位。
- The paper introduces the concrete face slab fissures and defects in Xiaoshan hydropower station as well as its repairing material and method. 文章详细介绍了小山水电站面板混凝土裂缝与缺陷修补加固用材料、修补加固方法。
- To find out the characters per pica of a type face at a particular type size copyfitting tables are available for this purpose. 要找出某一字体在某字大小下;每派卡的字符数量;可以查阅[配稿字数表].
- Trader can choose candlestick, bar or line type of chart by choosing appropriate sign on the left panel. 交易员可以通过在左边面板选择适当记号选择烛状图、条状图或线性图。
- Puppet laughed at those broken lines above him on the high ropes. 木偶得意的望着上头断了的悬线大笑。
- Strictly control the total deformation of dam body, especially the deformation after reservoir impoundment, is the most effective measure for avoiding concrete face slab rupture. 严格控制坝体的总体变形,特别是控制蓄水运行后的坝体变形,是避免出现面板挤压破坏的最有效手段。
- In the current application of pretensioning method, the tensioned tendons are usually of straight line type. 摘要在现有的先张法实践中,张拉的预应力筋一般均为直线形式。