您要查找的是不是:
- And a skilled worker was bricking up the wall. 和技术娴熟的工人砌体了墙。
- The old well was bricked up when it ran dry. 旧井干枯以后被人用砖堵上了。
- We want to brick up this entrance way. 我们想用砖将那入口堵住。
- All the windows were bricked up. 所有的窗户都用砖堵住了。
- Shenyang Xuelong Metal Decorates Fitting Up Project Co., Ltd. 沈阳学龙金属装饰装修工程有限公司。
- They've bricked up the western windows. 他们已用砖把西面的窗户封了。
- The windows had been bricked up. 那些窗户用砖堵住了。
- They've bricked up the door opening. 他们已用砖把门封了。
- Lead team to set up project target, including Quality, Cost, timing planning and resource requirement. 领导项目小组完成质量、成本、费用以及期限目标,并按阶段进行项目跟踪和项目管理;拟定、优化、调整计划并确定资源上的需求;
- Assist team to set up project target, including Quality, Cost, timing planning and resource requirement. 协助项目小组完成质量、成本、费用以及期限目标,并按阶段进行项目跟踪和项目管理;拟定、优化、调整计划并确定资源上的需求;
- We were bricked up in the house for the summer. 我们整个夏天都被锁在房子里。
- In the future we would have many cosmetic and make up project linked to Tuscan Soul. 在将来,我们将推出与托斯卡纳阳光相关的护肤和彩妆计划。
- And in Spain, the Gypsies squat in empty buildings, are evicted by the authorities who brick up doors and windows. 在西班牙,当局为收回租房砸碎了门窗,被驱逐出去的吉普赛人蹲坐在空荡荡的建筑物里,。
- Identify and prepare realistic project list for the budget of the financial year. Investigate all possible back up project to secure the FY budget. 确认和筹备在建项目年度清单和预算。调查一切可能的预期项目,以确保年度预算。
- JOB CHALLENGE - SET UP PROJECT TEAM AND WORK OUT THE PROJECT PLAN RE SCOPE, SCHEDULE, QUALITY, COST ETC. - REVIE...... ... 公司名称:华行玩具(深圳)有限公司工作地点:其他发布时间:2009-5-1
- At the end of table , There are 4pcs outrigger support and 4pcs castor , Convenient for moving and fix when set up project . 工作台底配有四条火箭脚支撑架和四个脚轮,方便搭建作业时的随时移动和固定。
- Participate in classifying project product/ target customer/IT and project research style, setting up project article/extend way/managing system. 参与项目产品/目标客户/资讯与项目寻找方式的分类,项目用品/推广方式等操作/管理系统的建立;
- He murdered his wife, and bricked up her body in the kitchen. 他杀死了妻子, 然后把她的尸体藏在厨房里, 用砖堵死。
- This position is to lead various project implementation in the area of BTS, which including following up project progres...... ... 公司名称:玫琳凯(中国)化妆品有限公司工作地点:上海市发布时间:2009-8-3
- To follow up project procedures, contact with customers, headquarter, assort with internal departments under project managers' direction. 后续项目的程序,与客户联系,总部,分类与内部各部门根据项目经理的方向发展。