您要查找的是不是:
- Preliminary Discussion on Preventing and Curing the Common Problems of 30m Box Beam Concrete Appearance Quality and Construct Craft 30米箱梁混凝土外观质量通病防治与施工工艺初探
- box beam concrete 箱梁混凝土
- The paper mainly expounds construction procedures for concrete box beam prestressed in post-tensioning method. 本文主要阐述了后张法预应力混凝土箱梁的施工方法。
- The article introduces the technical gist of the construction control of the fish-bellied concrete continuous box beam. 该文介绍了鱼腹式混凝土连续箱梁的施工控制技术要点。
- Non-uniform prestressed concrete continuous box beam is widely used because of its beautiful appearance,relatively big torsional stiffness and various service conditions. 变截面预应力砼连续箱梁因外形美观,抗扭刚度较大,能够适应各种使用条件,而被广泛应用。
- The stiffening beams of the side spans are prestressed concrete box beams. 主跨加劲梁为钢箱梁,边跨加劲梁为预应力混凝土箱梁。
- Aim at to structure characteristics of the prestressed concrete consecution box beam, tally up its familiar construction profile blemish with the quantity trouble, and analysis its produce the reason with study its prevention and cure measure. 针对预应力砼连续箱梁的构造特点,总结其常见施工外观缺陷和质量事故,并分析其产生原因和研究其防治措施。
- In prestressed concrete, consecution box beam construction process, to the external appearance quantity problem that appear, should tally up the experience precept, combine to adopt homologous technique measure. 在后张法预应力砼连续箱梁施工过程中,对出现的外观质量问题,应总结经验教训,并采取相应的技术措施。
- The one-dimensional mechanics state of traditional composite beam concrete bearing compressive loads was transited to three dimensional state by replacing it with the CFTs. 钢管砼-钢箱组合梁是用小径钢管砼取代砼板,将受压的砼板从单向受压状态转换为三向受压状态。
- The paper studies on deformation control problem in precast splice course of 25m wide arc prestressed concrete segment box beam in combination with Hu-Min Road Elevated Road Stage II Project in Shanghai City. 结合上海市沪闵路高架二期工程 ,对采用的 2 5m宽弧形预应力混凝土节段箱梁在预制拼装过程中的变形控制问题进行研究。
- The main suspension gallows consist of a steel box beam, sitting on hydraulic jacks that support all the structure during concreting. 主吊架有一钢箱梁组成,坐落在液压千斤顶上,在浇注混凝土过程中支撑所有结构。
- The article introduces the construction craft, construction method and implementation effect of cast-in-place reinforced concrete continuous box beam of Puji river overpass in Tianjin city. 介绍天津普济河道立交桥现浇钢筋混凝土连续箱梁的施工工艺、工方法及实施效果。
- Shear walls and the walls of the hollow box beam will be approximately 50 cm thick. 剪力墙和空心箱形梁的墙厚约50厘米。
- Compared with the railway bridge and culvert design specifications, the box beam structure design and construction method are seen rational and feasible. 通过有限元分析结果与铁路桥涵设计规范的比较得出,该箱梁结构设计合理,施工方案可行。
- Restrained torsion of thin-walled box beam with honeycomb core is analyzed on the basis of rigid profile assumption. 在刚性剖面假设的基础上分析具有蜂窝芯材薄壁盒式梁约束扭转问题。
- Restrained bending of thin-walled box beam with honeycomb core is analyzed on the basis of rigid profile assumption. 在刚性剖面假设的基础上分析具有蜂窝芯材薄壁盒式梁约束弯曲问题。
- The paper discussed the procedure and attentions of box beam precast for reference. 介绍了广州市环城高速公路跨广州大道连续箱梁桥的工程概况。
- The paper discussed proportion between side span and middle span in three spans prestressed continuous box beam bridge. 本文对三跨预应力连续箱梁桥的边跨与中跨比例问题进行了初步的探讨。
- Cracking of concrete flange slab in the negative moment area in steel-concrete composite continuous box beams affects its application for longer spans. 钢箱-混凝土组合连续梁负弯矩区混凝土的开裂问题影响了这类组合结构向更大跨度的发展。
- The paper gives the recount for the method and function of calculating distortion geometric nature of arbitrarily section in continuous box beam. 叙述任意截面箱形连续梁畸变几何性质的计算方法和作用。
- 今日热词
-
- 深远海浮式风电平台 - deep-sea floating wind power platform
-
- 京雄高速公路 - Beijing-Xiongan expressway
-
- 农业及相关产业增加值 - the added value of agriculture and related industries