engineering eost

 
  • 工程造價

engineering eost的用法和樣例:

例句

  1. The paper introduces computer application in engineering cost management and the prospect.
    介紹了計算機在工程造價管理中應用的現狀及前景。
  2. The design is a construction originally, strengthen the management to design the stage, is rey work to control the engineering cost.
    設計是建設之本,加強對設計階段的管理,是控制工程造價的重點。
今日熱詞
目錄 附錄 查詞歷史