engineering eost的用法和樣例:
例句
- The paper introduces computer application in engineering cost management and the prospect.
介紹了計算機在工程造價管理中應用的現狀及前景。 - The design is a construction originally, strengthen the management to design the stage, is rey work to control the engineering cost.
設計是建設之本,加強對設計階段的管理,是控制工程造價的重點。