您要查找的是不是:
- Familiar with Engineering Change Control process. 熟練掌握工程更改控制流程。
- Track quality for the engineering change parts. 對工程變更件產品的質量追蹤。
- Take the lead of engineering change about product. 負責領導產品方面的工程變更。
- Control of product engineering change. 產品工程變更之管制。
- Coordinate Engineering change timing with related parties. 與相關部門就工藝變更日程進行協調。
- Job PurposeTo manage control and administer all Engineering Change activities within the Engineering dept. 負責工程部門所有工程變更活動的控制和管理。
- ECMA Electronic Component Manufacturer Association ECN Engineering Change Notice. 工程更改通知工程需要更改或發表說明時使用的文件。
- Update manufacturing orders as necessary by monitoring system inquiries and new engineering change orders. 通過監視系統需求和新的工程變化訂單來更新生產訂單。
- Coordination and implementation of Engineering changes. 工程改變的協調及補充.
- Patentes Talgo is now developing the Talgo XXI trainset featuring diesel or electric power cars with gauge changing capability. Patentes Talgo公司目前正在開發以具有變軌距能力的內燃或電力動車為特色的 Talgo XXI型車組。
- Is a formal engineering change procedure implemented? Briefly describe the process. 是否實施工程更改操作?簡要描述該過程。
- PLM vendors with a PDM background have long had interfaces to ERP systems to handle engineering change notices. PDM背景的PLM軟體商早就設計了ERP系統交互界面來處理工程變更通知。
- Process and line set all engineering change notices for timely, accurate, cost effective implementation into production. 及時處理工程變更通知,將精確的、有效的成本執行到生產工作中。
- General data includes engineering change level, phase covered (prototype, pre-launch, production), key contact, part/process step number, process name/operation description. 基本數據包括工程更改等級、所處階段樣件試生產生產、主要聯繫人、零件/過程步驟編號、過程名稱/作業描述。
- Engineering Change Request: A request or suggestion to Engineering for an improvement in a process or procedure.Eficient Consumer Response: A term used to describe a way of doin. 工程技術方面改變要求,從工程技術方面提出的針對流程或規程的調整。有效客戶需求:是用於描述在零售行業如何招徠銷售合作夥伴。
- Ultimately, the risk must be some people assume, financial engineering change only risks and benefits of different preference in the allocation of customers. 歸根到底,風險總要有人承擔,金融工程改變的只是風險和收益在不同偏好客戶之間的分配。
- Based on modern information economics, dissymmetry information phenomenon between main bodies of project and its influences on engineering change risks are analyzed. 摘要運用現代信息經濟學的信息不對稱理論分析了建設項目主體之間的信息不對稱現象及其對工程變更風險的影響。
- The main advantage of our design methodology is that it can be easily integrated into the ECO (Engineering Change Order) stage in the existing ASIC design flow. 我們所提出之設計方法的主要優點,在於它可以整合於現有ASIC設計流程中的ECO部分。
- Control of the whole process: IPQC check various items of the whole process, including materials, production, operations, engineering change and OQC shiping inspection. 一).;全製程參與管控:通過IPQC對各生產製程的使用材料、生產條件、作業內容、工程變更的確認以及產品出貨前OQC的檢查,以確保產品品質。
- This year, however, Ferrari are lucky in that each driver is allowed one unscheduled engine change without penalty. 今年,無論如何,法拉利非常幸運,他們的每一位車手被允許不定期的更換一次引擎而不用遭受處罰。