您要查找的是不是:
- What is included in a Landed Cost estimate? Landed Cost預算包括甚麼內容?
- Assist PM for improving reliability of project cost estimate. 負責項目的成本分析和成本控制.
- How can I calculate my shipping charges for use in the Landed Cost estimate? 我怎樣計算我的託運費用,以便用於Landed Cost預算?
- Receive an immediate cost estimate for your shipment before shipping. 您可以在寄件前取得即時的預估費用。
- Cost estimate of the expense portion, i. e. the equipment and materials. 費用部分,即設備和原料的成本估計。
- Because the Renminbi currency value has not affected other 80% commodity cost, the exchange rate change the influence which produces to the product price is very small. 由於人民幣的幣值沒有影響到其餘80%25商品的成本,匯率的變化對產品價格產生的影響是很小的。
- Parametric and bottom-up cost estimation. 參數及自下而上成本估演算法。
- Costs Estimate For Trade Marks Application in the FRANCE. 法國商標註冊申請費用。
- Our Landed Cost engine provides you with a cost estimate of international shipments. 我們的Landed Cost引擎將為您提供國際貨件的成本估算。
- Be responsible for cost estimate, planning, contract management and resource allocation. 負責成本控制,項目計劃,合同管理及人員分配。
- Third, a cost estimate for the project was needed covering both the building and future running of the system. 第三,需要對系統的建設和今後的運行進行一次項目費用概算。
- Your Landed Cost estimate and actual shipment charges may vary for several reasons. 您的Landed Cost預算和實際託運費用不符可能有若干原因。
- And packaged food manufacturers are unlikely to lower prices because commodity costs remain relatively high and they are still trying to rebuild eroded margins. 包裝食品製造商未必會降低價格,因為農產品成本依然比較高,他們依舊想方設法重建越來越小的利潤空間。
- Cost estimate of maintenance manpower is the important part of military aircraft LCC cost estimate. 維修人力費用估算是軍用飛機壽命周期費用估算的重要組成部分。
- His cost estimate was way off base, far higher than warranted by current prices for labor and materials. 他的成本估計是錯的,比現在人工跟原料價保證的成本高出太多。
- And UNHCR, to obtain an independent review of the cost estimates. 驗,請獨立機構對費用概算進行審查。
- Manage the project budget based on the cost estimation budget. 在費用評估預算的基礎上管理項目預算。
- Based on that, developed a B/S structure cost estimation system. 在此基礎上,開發了基於B/S結構的成本估算系統。
- Information system cost estimation is the base of tenders. 信息系統成本測算是投標或報價的基礎。
- Per Unit key for material costing estimates. 每單位的關鍵材料成本的估計。